D-PEMX-DY-23試験無料問題集「EMC Dell PowerEdge MX Modular Deploy 2023 認定」
An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.
What operation was in progress when the power button was blinking green?
What operation was in progress when the power button was blinking green?
正解:C
解答を投票する