When reviewing the disaster recovery plan for two data centers, you find that:
- The copy of data at remote Site B will lag behind the production data at Site A by 5
minutes
- It will take 2 hours after an outage at Site A to shift production to Site B.
- Three more hours will be needed to power up the servers, bring up the network,
and redirect users to Site B.
What is the recovery point objective (RPO) of this plan?
- The copy of data at remote Site B will lag behind the production data at Site A by 5
minutes
- It will take 2 hours after an outage at Site A to shift production to Site B.
- Three more hours will be needed to power up the servers, bring up the network,
and redirect users to Site B.
What is the recovery point objective (RPO) of this plan?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Click on the calculator icon in the upper left corner.
An application requires 3.5 TB of capacity. The application generates 2300 IOPS to disks during peak workloads. The vendor indicates that a 146 GB, 15K rpm drive is capable of performing a maximum of 150 IOPS.
How many disks are required to meet both capacity and performance requirements?
An application requires 3.5 TB of capacity. The application generates 2300 IOPS to disks during peak workloads. The vendor indicates that a 146 GB, 15K rpm drive is capable of performing a maximum of 150 IOPS.
How many disks are required to meet both capacity and performance requirements?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
DRAG DROP
The following represents a list of RAID levels and application characteristics. Match each RAID level to the application characteristic to which it is most suitable.

The following represents a list of RAID levels and application characteristics. Match each RAID level to the application characteristic to which it is most suitable.

正解: