NS0-515試験無料問題集「Network Appliance NetApp Certified Implementation Engineer-E-Series 認定」
A customer needs toadd an EF280 with FC into its existing Brocade fabric but the FC ports in the SANtricity System Manager are showing the FC ports as down and the LED on the FC HIC is amber.
Which three tasks does the installer need to complete to solve this problem? (Choose three.)
Which three tasks does the installer need to complete to solve this problem? (Choose three.)
正解:C,D,E
解答を投票する
Click the Exhibit button.

Acustomer's host is running a Red Hat Enterprise Linux 7.6 server with dm-mp configured for ALUA and is connected to a single volume on the EF280 system that is shown in the exhibit.
In this scenario, how many active/optimized paths are available to the volume?

Acustomer's host is running a Red Hat Enterprise Linux 7.6 server with dm-mp configured for ALUA and is connected to a single volume on the EF280 system that is shown in the exhibit.
In this scenario, how many active/optimized paths are available to the volume?
正解:C
解答を投票する