NCSC-Level-1試験無料問題集「Nutanix Certified Services Consultant (NCSC): Level 1 認定」

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.
Which option should be used to resolve this issue?

During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.
Which command should be used to begin the process?

A consultant runs the Foundation Applet and discovers all the nodes. The consultant wants to use the latest version of Foundation for imaging for support purposes and to cover the latest hardware and software hypervisor support.
What should the consultant do to upgrade Foundation on a node?

A consultant notices while assigning VLAN tags to hosts and CVMs in a running cluster, that Prism Element displays alerts indicating a node is down.
What should the consultant do to prevent these alerts?

A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)

A consultant is onsite and needs to start their Foundation Virtual Machine (FVM) to image Nutanix hardware. The FVM fails to boot. The consultant decides to use a different Foundation method.
Assuming the nodes will discover, which Foundation type or configuration option should the consultant select?

While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.
What would cause this warning to be issued?

A consultant is planning an installation and needs to collect configuration items to be used during the install. The data needed from the customer are IP addresses, Gateway, DNS servers, and NTP Servers.
Which Cluster Deployment document must be completed with the customer?