1Z0-1003-21試験無料問題集「Oracle Field Service 2021 Implementation Essentials 認定」

What happens when you enable the assignment parameter "Limit work by points"?

解説: (GoShiken メンバーにのみ表示されます)
A customer's 'Senior Administrator' user is responsible for periodically auditingthe configuration changes that are made to their Oracle Field Service Cloud (OFSC) instance.
Which option fulfills that requirement?

An activity with an "Installation" work skill exists in a bucket and is ready to be routed.
The resource has nowork skills designated on his or her record, but qualifies for that activity in all other categories.
How does routing handle the assignment of this activity?

Which two statements are correct regarding the characteristics of an SLA window?

Which two are correct statements regarding Daily Extract file data configuration?

解説: (GoShiken メンバーにのみ表示されます)
Which two statement are correct regarding activity assignment via Collaboration?

A customer has technicians with varying degrees of training to perform installation work.
Their current corresponding skill levels are:
Expert level value = 100
Fully Qualified level value = 50
Novice level value = 25
For activities that require expert technicians, there is already an "Installation" work skill in place to identify those high visibility activities and enforce that assignment rule.
However, another segment of mid-tier installation activities must be assigned to technicians that are at least novices, but even better if they are considered fully qualified.
Which configuration satisfies the requirement of assigning thosemid-tier installation activities?

Your customer identified that their current capacity indicators for major and critical capacity levels need to be modified.
Which step must you take to solve this issue?

解説: (GoShiken メンバーにのみ表示されます)
When assigning work zones to field resources, each zone assignment can be eithef 'regular' or 'temporary' (override).
Which statement is accurate regarding how those types of work zone assignments interact?

A utility company sees several 'New Connect' activities being added to the routing bucket throughout the day.
They want 'Meter Read' activities to potentially be removed from the technician's route so that the 'New Connect' activities can be assigned if the technician qualifies for the activity.
They enabled reoptimization in their routing plan and created a reoptimization filter targeting the 'Meter Read' activities.
What additional settings are required in the routing plan to meet the desired behavior?