C-TSCM42-67試験無料問題集「SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 認定」

You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?

What are characteristics of repetitive manufacturing? (Choose three)

正解:B,C,E 解答を投票する
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)

正解:B,C,E 解答を投票する
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)

Which of the following properties applies to multi-site planning in SAP ECC?

Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?

Which activity can trigger an automatic availability check for the components of a production order?

Which of the following statements best defines SAP ERP?

In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default.
However, some materials need to have a different planning horizon.
Which procedure do you recommend for setting the planning horizon?