Resource planning must take all of the following into account except for:

Theoretically construct a summary activity for activities 2001 through 2004. Using the "normal" schedule, what is the cost of the hammock?

Due to a testing delay, release of the product for manufacture is delayed by 5 workdays and the product manual misses its print window at the printer. If the printer is delayed by 10 workdays, what is the delay to produce release?

In a graphical earned value analysis, what time-scaled value determines the reporting intervals for both schedule and cost performance?

What day would Activity C complete if the duration of Activity A was reduced by five days?

Which of the following are NOT considerations or constraints of the planning process for construction scheduling?

Estimate to complete (ETC) is __________________.

Assuming a total of 30 lifts per crane per day, what is the maximum number of lifts that could be accomplished using 3 small tower cranes over a 5-day period?

During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?

Using a 1.75 cubic yard [1.34 cubic meter] bucket, how many lifts does it take to pour each 2.000-cubic foot [56.64 cubic meter] column?