A. 100% coverage at the required sensitivity
B. prod spacing of at least
C. at least three separate examinations
D. a calibration of each piece of magnetizing equipment
A. glass lined piping
B. carbon steel piping systems
C. carbon steel piping systems operating between 25°F-250°F
D. plastic piping
A. Straight Run Pipe
B. Fittings
C. Dead legs
D. Valves
A. all exposed threads are covered
B. the joint has straight threads only
C. the joint is leaking
D. the joint has tapered threads only
A. diameter enlargement
B. internal product build-up
C. swelling
D. creep
A. -20°F
B. 0°F
C. -20°C
D. -29°F
A. Regulate fluid flow
B. Stop all flow
C. Allow full flow
D. Prevent back flow
A. None
B. Cracks will not show on radiographs
C. T/3
D. 3/16"
A. system service; classification; identification numbers
B. original heat and batch numbers
C. all original construction data
D. all jurisdictional requirements
A. "B" is for identification of the weld
B. radiograph shall be considered unacceptable
C. radiograph should not be rejected
D. "B" is for identification of the welder