A high incidence of failures has developed during aircraft acceptance testing. The identified failure is that an instrument panel light has malfunctioned on 6 of the last 10 aircraft tested.
This problem needs to be investigated and a Failure Reporting and Corrective Action System (FRACAS) needs to be completed without stopping aircraft production.
If the cause of the failure is determined to be a faulty subassembly manufactured only by a single supplier, and this situation is threatening to shut down aircraft production, the next step should be to Response:
This problem needs to be investigated and a Failure Reporting and Corrective Action System (FRACAS) needs to be completed without stopping aircraft production.
If the cause of the failure is determined to be a faulty subassembly manufactured only by a single supplier, and this situation is threatening to shut down aircraft production, the next step should be to Response:
正解:C