3303試験無料問題集「Avaya Proactive Contact Implementation and Maintenance 認定」

A Job is running on Avaya Proactive Contact 5.0 and the system operator notices that not enough records are selected. The operator wants to change selection criteria to select more records and re-run the call selection without stopping the job.
How can this be achieved?

What are the correct Job control functions available in Avaya Proactive Contact Monitor application?

Which two statements are accurate about configuring the Supervisor Software? (Choose two.)

A system operator opens a Job Status view in the Avaya Proactive Contact Monitor and notices that the status for job EXP100 is shown as Active, but the character-based Job Monitor no longer shows the job as running. The system operator calls support and asks for an explanation.
Which three actions would you perform to begin troubleshooting the problem? (Choose three.)

正解:B,C,D 解答を投票する
Which three features are available in soft-dialer? (Choose three.)

正解:A,B,D 解答を投票する
From the System Administrator Main menu option for Transfer and Process records, the option for "Recover old calling list" performs which task?

Which two statements are accurate regarding networking requirements in Avaya Proactive Contact (APC. installation? (Choose two.)

Which command would you run to check that the link to a "Time Server" is functioning and is stable?