7003試験無料問題集「Avaya Communication Server 1000 for Avaya Aura® Implementation 認定」
A customer is installing a new common processor Media Gateway (CPMG) in a
Communication Server (CS) 1000E system. They are connected to the backplane serial port 0 of the MGC to access the configuration menu. No IP information exists for the MGC.
How does the customer access the configuration menu for the MGC?
Communication Server (CS) 1000E system. They are connected to the backplane serial port 0 of the MGC to access the configuration menu. No IP information exists for the MGC.
How does the customer access the configuration menu for the MGC?
正解:A
解答を投票する
A customer has a Communication Server (CS) 1000E Rls. 7 x system with a System
Manager as the primary Security Server that has been designated as a Deployment
Server. The application file (.nai) has been uploaded to the deployment manager library.
The customer has added an element to the security domain and wants to deploy software applications to the element.
With respect to deployment services, which statement is false?
Manager as the primary Security Server that has been designated as a Deployment
Server. The application file (.nai) has been uploaded to the deployment manager library.
The customer has added an element to the security domain and wants to deploy software applications to the element.
With respect to deployment services, which statement is false?
正解:B
解答を投票する
A technician is planning to upgrade a customer's existing Communication Server 1000E Rls. 6.0 system.
During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
During the upgrade, a CPPM server card from storage will be added to provide an additional signaling server.
Which two statements describes what must be done to the CPPM server card to distinguished it as a signaling Server (Choose two)
正解:A,B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)