AD0-E106試験無料問題集「Adobe Experience Manager Dev/Ops Engineer 認定」

How should a DevOps Engineer perform an AEM upgrade that preserve version and Workflows?

A DevOps Engineer configures a delay in the out of the box online backup.
What is he result of a delay that is too large?

What supported when server should a DevOps Engineer use when setting up the dispatcher version 4.3.1 in a Unix environment.

A DevOps Engineer needs to change the default size for a tar file to 512 MB.
Which option should be used to enabled this configuration?

Assuming the project was generated using the AEM maven archetype, which maven command triggers the build and deployment of a content-packet to a publish instance?

In additional to a manual start what two triggers can DevOps Engineer define to start the CI/CD pipeline?
(Choose two.)