A. Label cables
B. Install and secure innerduct
C. Ensure the cable has been tested and accepted
D. Attach pull rope
A. 880 N (200 lbf)
B. 222N (50 lbf)
C. 330 N (75lbf)
A. 10 m (33')
B. 30 m (100')
C. 15 m (50')
D. 5 m (16.5')
A. 0.5m (1.6')
B. 1.2 m (4')
C. 3m (10')
D. 1m (3.3')
A. Ribbon
B. Tight buffered
C. Single stranded
D. Loose tube
A. 0.3 m (1')
B. 15 m (50")
C. 30 m (100')
D. 3 m (10')
A. National Electrical Contractors Association (NECA) and National Fire Protection Association (NFPA)
B. Alliance for Telecommunications Industry Solutions (ATIS) and Society for Cable Telecommunications Engineers (SCTE)
C. International Organization for Standardization (ISO) and International Electrotechnical Commission (IEC)
D. Comite Europeen de Normalisation Electrotechnique (CENELEC) and Electronic Industries Association (EIA)