642-980試験無料問題集「Cisco Troubleshooting Cisco Data Center Unified Fabric (DCUFT) 認定」
A customer reports that it cannot establish a vPC peer link between two Cisco Nexus
5548UP Switches. The interfaces on both switches are configured and cabled correctly.
The interface status is up/down on switch 1 and up/up on switch 2. Which three steps are taken to isolate the root cause? (Choose three.)
5548UP Switches. The interfaces on both switches are configured and cabled correctly.
The interface status is up/down on switch 1 and up/up on switch 2. Which three steps are taken to isolate the root cause? (Choose three.)
正解:B,C,D
解答を投票する