H13-431-ENU試験無料問題集「Huawei HCIE-Data Center (Written) V2.0 認定」
The storage capacity required by Site A is 2543 GB, and the storage capacity required by Site B is 3000 GB. The backup data of Site B is remotely copied to Site A and saved. It is considered for copy compression. The compression ratio is 3. What is the backend storage capacity required by Site A?
正解:D
解答を投票する
In the cloud network integration scenario, a client successfully applies for a cloud host and binds the EIP. In case of a problem, the cloud host does not reach the external network, and another cloud host that reaches the same network segment does not pass. What is the possible reasons? (Multiple Choice)
正解:B,D
解答を投票する
The two-site three-center solution in the data center disaster recovery plan, that is, one copy of the data has three backups (including itself) and is distributed in three different geographical locations, which are called three data centers, usually referred to as production centers, plus City disaster recovery center and remote disaster recovery center.
正解:A
解答を投票する
In the cloud network integration scenario, the cloud host applies for the SNAT service. When the cloud host traffic is accessed to the external network, the source IP address is replaced with the public network address, and the traffic reaches the public network through the Border Leaf. For the return traffic of the Border Leaf to the firewall, manual configuration is required.
正解:B
解答を投票する
Under the current architecture of Enterprise A, there is no cloud platform department. The computing needs are handled by IT department. The network requirements are handled by the network department. The two departments can't be integrated in the short term.
In this case, which is wrong with the interface description provided by Huawei SDN solution?
In this case, which is wrong with the interface description provided by Huawei SDN solution?
正解:D
解答を投票する