When a third-party system needs to integrate NetEco or Huawei equipment, Huawei needs to provide northbound interfaces and protocols, and the third-party system manufacturer needs to evaluate the access workload and do development and commissioning.
For the power distribution room of a large data center, when configuring the air supply air conditioner, which of the following main factors for selecting the hood air supply and the duct air supply? (Multiple choice)
When the outdoor unit of Huawei air-cooled air conditioner is installed horizontally, the distance from the wall or obstacle is required to be >() (MM).
When the NetEco management system is sold in the market, which of the following situations does not require submitting RM to the management system RAT for decision-making?
The high-end server of NetEco6000V6R8 can support the access of 1 million measurement points, which is equivalent to supporting the access of up to () smart devices?