CTFL-AT試験無料問題集「ISQI ISTQB Certified Tester - Foundation Level Extension - Agile Tester 認定」
You are developing the code that controls an industrial Espresso machine which will be operated by waiting staff in restaurants.
The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.
A User Story for the Operator-Instructions module is as follows:
"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee." The following is a list of risks identified for this story, with assigned probability and impact.
The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.
A User Story for the Operator-Instructions module is as follows:
"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee." The following is a list of risks identified for this story, with assigned probability and impact.
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
An Agile team is developing a Pay-TV web portal. In Iteration 3, only PayPal and credit card payments are supported. A new user story in Iteration 4 adds payment using credit from a smartcard.
Which of the following would you expect to describe valid and relevant acceptance tests for this user story?
Which of the following would you expect to describe valid and relevant acceptance tests for this user story?
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Which of the following activities are done in release planning?
1) Identifying testable user stories with acceptance criteria.
2) Elaborating the user stories into tasks.
3) Prioritizing the user stories.
4) Creating acceptance tests for the user stories.
5) Analyzing risks for each of the user stories.
6) Performing high level estimation for the release.
1) Identifying testable user stories with acceptance criteria.
2) Elaborating the user stories into tasks.
3) Prioritizing the user stories.
4) Creating acceptance tests for the user stories.
5) Analyzing risks for each of the user stories.
6) Performing high level estimation for the release.
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Consider an online application that allows registered users to pay the annual car tax based on the vehicle's engine power in kW. Given the following user story:
"As a customer I need the online application to calculate the annual car tax amount that I need to pay for my car:
* If the power of the vehicle is less than 20 kW, then the annual car tax is free
* If the power of the vehicle is more or equal than 20 kW but less or equal than 150 kW, then the annual car tax is 250 Euros
* If the power of the vehicle is more than 150 kW, then the annual car tax is 750 Euros" What is the MOST suitable use of a black-box test design technique for this user story?
"As a customer I need the online application to calculate the annual car tax amount that I need to pay for my car:
* If the power of the vehicle is less than 20 kW, then the annual car tax is free
* If the power of the vehicle is more or equal than 20 kW but less or equal than 150 kW, then the annual car tax is 250 Euros
* If the power of the vehicle is more than 150 kW, then the annual car tax is 750 Euros" What is the MOST suitable use of a black-box test design technique for this user story?
正解:B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
In Agile projects, which of the following approaches would result in the best compromise for preserving independence of testers and for allowing testers to have a good understanding of the product as well as good relationships with other team members?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)