PVIP試験無料問題集「NABCEP PV Installation Professional (PVIP) Board Certification 認定」

A PV array is tested with an IV curve tracer. The fill factor is 0.70, lower than the expected 0.80. What does this indicate?

Which of the following is an NEC-indicate means to identify PV source and output circuits at accessible points of termination connection, and splices?

A AWG THWN-2 PV output conductors from two PV arrays are run in the same 3 in, conduit to their respective functionally grounded inverters in the building. The three PV source circuits are each protected by a 15A fuse in the combiner box at the array. The conduit, which is strapped directly to the roof, is exposed to design temperatures of 140' F (60' C) during its 30 ft.
Exposed run. What is the MAXIMUM current carrying capability value of the PV output conductors?

A site has an average wind speed of 25 mph and is classified as Exposure Category C per ASCE 7. What is the minimum wind design speed for the PV array structure?

解説: (GoShiken メンバーにのみ表示されます)
A PV array is installed with a rapid shutdown system per NEC 690.12. The array is 15 feet from the service entrance. What is the maximum voltage allowed within the array boundary 30 seconds after shutdown initiation?

Which of the following is an NEC requirement regarding access for large-scale PV electric power production facilities?

A PV system equipped with rapid shutdown requires a label stating ''RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM''.
Which is the BEST description of where this label is required?

During a PV system inspection, an installer notices that the rapid shutdown system fails to de-energize the array within 30 seconds of initiation. What is the most likely cause based on NEC 690.12 requirements?

A 20 kW system has a measured output of 18 kW at STC. What is the total system loss?

Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?

A PV system produces 12,000 kWh annually at a site with 1500 kWh/m²/year insolation. The array area is 50 m². What is the system efficiency?

On a PV system larger than 100kw, which PV array design will provide the HIGHEST degree of performance monitoring.
Granularity, and ease of troubleshooting performance issues?

An 8KWsc roof-mounted array is placed on a school building. The inverter is located within 1 ft, of the array boundary and has an integrated ac-and dc-disconnecting switch. The system is to be connected to a 400A load center, protected by a 400A main breaker. Which of the following MUST be included to meet NEC requirements?