CFPE試験無料問題集「NFPA Certified Fire Plan Examiner (CFPE)Exam 認定」

Which of the following would not require having to submit construction documents for all fire protection systems and the issuance of a permit by the AHJ?

解説: (GoShiken メンバーにのみ表示されます)
The symbol above is a representation of which one of the following?

解説: (GoShiken メンバーにのみ表示されます)
Which one of the following is NOT a typical reason to require construction permits and the review of plans by local government?

解説: (GoShiken メンバーにのみ表示されます)
Exhibit.

All work performed on the sprinkler system described on plan sheet F0.1 shall be in accordance with which NFPA documents'?

解説: (GoShiken メンバーにのみ表示されます)
Exhibit.

According to plan sheet F01, hydraulic calculations must be based on flow criteria obtained by new flow tests conducted by which one of the following?

解説: (GoShiken メンバーにのみ表示されます)
Actuation of alarm notification appliances at the protected premises shall occur within how many seconds after the activation of an initiating device?

解説: (GoShiken メンバーにのみ表示されます)
Exhibit.

Which of the following best describes the location of the manual pull station on plan A12?

解説: (GoShiken メンバーにのみ表示されます)
What is the minimum required rating for a fire door assembly installed in a 2-hour rated fire barrier?

解説: (GoShiken メンバーにのみ表示されます)
Exhibit.

Based on site plan C1 of the plan set what is the maximum depth the water lines are to be buried''

解説: (GoShiken メンバーにのみ表示されます)
NFPA is responsible for which of the following activities involved in the code development process?
I. Establish rules to promote fairness of the process
II. Perform laboratory tests to validate accuracy of published information III Enforce compliance of codes and standards IV. Administer the development process

解説: (GoShiken メンバーにのみ表示されます)