NS0-014試験無料問題集「Network Appliance Implementation Engineer - MetroCluster 認定」
A customer has a MetroCluster in which one site had suffered a power outage. The MetroCluster performed a switchover to the secondary site. The storage administrator is now preparing to run a DR switchback, to restore normal operations across the two sites for the MetroCluster.
Which two commands does the administrator have to run before the switchback? (Choose two).
Which two commands does the administrator have to run before the switchback? (Choose two).
正解:A,D
解答を投票する