Choose the correct answer
An engineer using SysML modeling tool B imports an XMI die produced by SysML modeling tool A (containing a complete model) and makes changes to the model What is the best way XMI provides to introduce the changes back to the original model in the original tool (Tool A)?
An engineer using SysML modeling tool B imports an XMI die produced by SysML modeling tool A (containing a complete model) and makes changes to the model What is the best way XMI provides to introduce the changes back to the original model in the original tool (Tool A)?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Choose the correct answer.
An engineering learn has been charged to design and build an embedded real-time control system using COTS (Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there may not be any components on the market that will meet both timing and cost constraints Given this, what information must be in the model before the engineering team can begin selecting and procuring COTS components?
An engineering learn has been charged to design and build an embedded real-time control system using COTS (Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there may not be any components on the market that will meet both timing and cost constraints Given this, what information must be in the model before the engineering team can begin selecting and procuring COTS components?
正解:B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
Choose the coned answer.
A department director is responsible (or monitoring the system development processes in a large systems engineering company. In a few systems engineering projects, irritation developed recently between the specialists department's requirements analysts and the system engineering design team, although the methodology had been introduced a couple of years ago.
How could the director resolve this conflict?
A department director is responsible (or monitoring the system development processes in a large systems engineering company. In a few systems engineering projects, irritation developed recently between the specialists department's requirements analysts and the system engineering design team, although the methodology had been introduced a couple of years ago.
How could the director resolve this conflict?
正解:C