The ACME company has executed an upgrade plan for the DV920 environment. Which three activities are mandatory post-upgrade tasks that should be performed after an upgrade?
A user is unable to save One View Reports from JDE applications. An "Invalid user and password" error message is logged in the HTML SERVER ERROR LOG. Which two things must be verified to troubleshoot the issue?
The ACME company wants to upgrade the development environment from E19.1 and decides to run a Data-Only upgrade. Which two conversions are not required during the execution of Data-Only upgrade plan?
EnterpriseOne provides the Server Manager as its interface where administrator can capture vital resource information about the running EnterpriseOne Kernels. Which two diagnostic types can be captured as a part of resource Manager?
ACME would like to integrate its existing LDAP server with EnterpriseOne to users in one system. With LDAP authentication enabled, which two other profile values can be maintained in the LDAP server, in addition to user profiles?
The ACME company is upgrading from E1 9.1 to E1 9.2 by using the Simplified Upgrade method. Which of the Mowing activities is considered a prerequisite for the upgrade?
What does the following command install? Setup.exe PACKGE_NAME=PACKGE E1_INSTALL_ MODE=COMPACT ORACLE _HOME=installpath ORACLE_ HOME _NAME=oracleHomeDirectory