C_S43_2601試験無料問題集「SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601) 認定」
Schedule a Maintenance Plan
The project team evaluates during the implementation project the scheduling of Maintenance Plans in SAP S
/4HANA Asset Management. The following features need to be checked:
Schedule a Maintenance Plan
Display a generated Maintenance Order
Schedule the previously created Maintenance Plan. The following prerequisites have to be met:
The next upcoming call is the 4 MON Maintenance Package
Calculate the Completion Date of the last Maintenance Package as follows: Today's date minus 4 weeks (e.g.
today's date: 15th of December > > > Completion Date: 17th of November) The Call Date is always 10 days before the Plan Date.
Note:
Check your Maintenance Plan and adapt it, if necessary, before you schedule it.
Check the following information in the generated Maintenance Order:
number of order operations: 2
Maintenance Plan: number of the previously created Maintenance Plan
Last Included Task List: A / TL-## / 1
The project team evaluates during the implementation project the scheduling of Maintenance Plans in SAP S
/4HANA Asset Management. The following features need to be checked:
Schedule a Maintenance Plan
Display a generated Maintenance Order
Schedule the previously created Maintenance Plan. The following prerequisites have to be met:
The next upcoming call is the 4 MON Maintenance Package
Calculate the Completion Date of the last Maintenance Package as follows: Today's date minus 4 weeks (e.g.
today's date: 15th of December > > > Completion Date: 17th of November) The Call Date is always 10 days before the Plan Date.
Note:
Check your Maintenance Plan and adapt it, if necessary, before you schedule it.
Check the following information in the generated Maintenance Order:
number of order operations: 2
Maintenance Plan: number of the previously created Maintenance Plan
Last Included Task List: A / TL-## / 1
正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 9 Overview
The goal of this task is to trigger the maintenance schedule you built in Task 8 so that the system generates an actual work order. You must meet specific scheduling conditions to ensure the right maintenance cycle (the 4- month package) is triggered.
Step 1: Adapt Scheduling Parameters (IP02)
Before starting the schedule, you must ensure the "Call Date" rules are correct.
* Transaction : Enter IP02 (Change Maintenance Plan).
* Maintenance Plan : Enter the number you saved in Task 8 and press Enter .
* Scheduling Parameters Tab :
* Call Horizon : Adjust this so that the Call Date occurs exactly 10 days before the Plan Date.
* Note: If your system uses percentages, you will need to calculate the percentage of the 4-month cycle that results in a 10-day lead time.
* Save your changes.
Step 2: Schedule the Plan (IP10)
Now you will "start" the clock for this maintenance schedule.
* Transaction : Enter IP10 (Schedule Maintenance Plan).
* Maintenance Plan : Enter your plan number and press Enter .
* Start Scheduling : Click the Start icon (or go to Maintenance plan > Scheduling > Start ).
* Enter the "Start Date" / "Completion Date" :
* The Rule : You must use Today's date minus 4 weeks .
* Example: If today is April 19, enter March 22.
* Press Enter . The system will calculate the next calls.
* Verify the Package : Ensure the next upcoming call is indeed the 4 MON (4-month) Maintenance Package.
* Save (Floppy Disk icon). This will generate a new Maintenance Order number.
Step 3: Verify the Generated Maintenance Order
You must now check that the order was created correctly based on the rules of your Task List (Task 7) and Maintenance Plan (Task 8).
* Display Order : In IP10 , select the line for the generated call and click the Display Order icon (or use transaction IW33 with the new order number).
* Check the following three items :
* Operations : Verify there are exactly 2 operations in the order (the Monthly and 4-Month tasks).
* Maintenance Plan : Confirm the order shows your specific Maintenance Plan number.
* Task List : Verify the "Last Included Task List" is A / TL-48 / 1 .
Explanation:
Task 9 Overview
The goal of this task is to trigger the maintenance schedule you built in Task 8 so that the system generates an actual work order. You must meet specific scheduling conditions to ensure the right maintenance cycle (the 4- month package) is triggered.
Step 1: Adapt Scheduling Parameters (IP02)
Before starting the schedule, you must ensure the "Call Date" rules are correct.
* Transaction : Enter IP02 (Change Maintenance Plan).
* Maintenance Plan : Enter the number you saved in Task 8 and press Enter .
* Scheduling Parameters Tab :
* Call Horizon : Adjust this so that the Call Date occurs exactly 10 days before the Plan Date.
* Note: If your system uses percentages, you will need to calculate the percentage of the 4-month cycle that results in a 10-day lead time.
* Save your changes.
Step 2: Schedule the Plan (IP10)
Now you will "start" the clock for this maintenance schedule.
* Transaction : Enter IP10 (Schedule Maintenance Plan).
* Maintenance Plan : Enter your plan number and press Enter .
* Start Scheduling : Click the Start icon (or go to Maintenance plan > Scheduling > Start ).
* Enter the "Start Date" / "Completion Date" :
* The Rule : You must use Today's date minus 4 weeks .
* Example: If today is April 19, enter March 22.
* Press Enter . The system will calculate the next calls.
* Verify the Package : Ensure the next upcoming call is indeed the 4 MON (4-month) Maintenance Package.
* Save (Floppy Disk icon). This will generate a new Maintenance Order number.
Step 3: Verify the Generated Maintenance Order
You must now check that the order was created correctly based on the rules of your Task List (Task 7) and Maintenance Plan (Task 8).
* Display Order : In IP10 , select the line for the generated call and click the Display Order icon (or use transaction IW33 with the new order number).
* Check the following three items :
* Operations : Verify there are exactly 2 operations in the order (the Monthly and 4-Month tasks).
* Maintenance Plan : Confirm the order shows your specific Maintenance Plan number.
* Task List : Verify the "Last Included Task List" is A / TL-48 / 1 .
Check Inspection Lot and record Inspection Results
The project team evaluates during the implementation project the checking of Inspection Lots Checklist processing including result recording. The following features need to be checked:
* Display the automatically created Inspection Lot
* Record Inspection Results
* Display the automatically created Inspection Lot for the previously created Maintenance Order including Checklist. The Inspection Lot comprises the following data:

* Record Inspection Results for the previously created Inspection Lot so that the Usage Decision is automatically set to Can be used .
The project team evaluates during the implementation project the checking of Inspection Lots Checklist processing including result recording. The following features need to be checked:
* Display the automatically created Inspection Lot
* Record Inspection Results
* Display the automatically created Inspection Lot for the previously created Maintenance Order including Checklist. The Inspection Lot comprises the following data:

* Record Inspection Results for the previously created Inspection Lot so that the Usage Decision is automatically set to Can be used .
正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 13 Overview
This task focuses on the quality management (QM) integration with maintenance. You will verify the inspection lot that was automatically triggered by your maintenance order and then record the results to confirm the technical object is fit for use.
Step 1: Display the Automatically Created Inspection Lot
Before recording results, you must verify that the system generated the correct inspection lot for your maintenance order.
* Access the Transaction : Enter QA03 (Display Inspection Lot) in the command field and press Enter .
* Locate the Lot : Search for the inspection lot associated with the maintenance order you created in Task 12.
* Verify the Following Data :
* Material : T-PM1100
* Plant : 1010
* Inspection Lot Origin : 89 (Miscellaneous)
* Group : CL-DE-00
* Group Counter : 1
Explanation : The inspection lot is the central record for quality testing. Seeing these specific values (Group CL-DE-00) confirms that the classification you set up in Task 11 correctly triggered the intended inspection plan.
Step 2: Record Inspection Results
This is the process of entering the actual findings from the checklist inspection.
* Access the Transaction : You can navigate directly from the Inspection Lot in QA03 or use transaction QE51N (Results Recording Selection).
* Select the Lot : Enter your inspection lot number and click Execute .
* Record Results :
* Enter the inspection values for each characteristic listed in the checklist.
* Ensure the values you enter are within the "Acceptable" range or marked as "Pass".
* Automatic Usage Decision : Record the results such that the Usage Decision (UD) is automatically set to "Can be used" .
* Save : Click the Save (floppy disk) icon.
Explanation : By recording positive results, you satisfy the quality requirements for the maintenance task.
The automatic transition to "Can be used" status tells the system the pump has passed inspection and the maintenance order can proceed toward completion.
Explanation:
Task 13 Overview
This task focuses on the quality management (QM) integration with maintenance. You will verify the inspection lot that was automatically triggered by your maintenance order and then record the results to confirm the technical object is fit for use.
Step 1: Display the Automatically Created Inspection Lot
Before recording results, you must verify that the system generated the correct inspection lot for your maintenance order.
* Access the Transaction : Enter QA03 (Display Inspection Lot) in the command field and press Enter .
* Locate the Lot : Search for the inspection lot associated with the maintenance order you created in Task 12.
* Verify the Following Data :
* Material : T-PM1100
* Plant : 1010
* Inspection Lot Origin : 89 (Miscellaneous)
* Group : CL-DE-00
* Group Counter : 1
Explanation : The inspection lot is the central record for quality testing. Seeing these specific values (Group CL-DE-00) confirms that the classification you set up in Task 11 correctly triggered the intended inspection plan.
Step 2: Record Inspection Results
This is the process of entering the actual findings from the checklist inspection.
* Access the Transaction : You can navigate directly from the Inspection Lot in QA03 or use transaction QE51N (Results Recording Selection).
* Select the Lot : Enter your inspection lot number and click Execute .
* Record Results :
* Enter the inspection values for each characteristic listed in the checklist.
* Ensure the values you enter are within the "Acceptable" range or marked as "Pass".
* Automatic Usage Decision : Record the results such that the Usage Decision (UD) is automatically set to "Can be used" .
* Save : Click the Save (floppy disk) icon.
Explanation : By recording positive results, you satisfy the quality requirements for the maintenance task.
The automatic transition to "Can be used" status tells the system the pump has passed inspection and the maintenance order can proceed toward completion.