A. Result recording in the inspection Lot
B. Defective recording in the inspection Lot
C. Approval of quality notification
D. UD for an inspection lot
E. Manual confirmation of a physical sample drawing
A. Settings for the inspection type activated in the material level
B. Usage of the class characteristics in the task list
C. Configuration settings
D. Master inspection characteristic linked to class characteristics
A. Inspection point for incoming certificates
B. Inspection point for defects recording
C. Inspection point for functional location
D. Inspection point for equipment
A. Audit question have no long texts
B. Corrective actions have partners
C. Audit questions have no status
D. Corrective actions have no search field
A. Trigger a subsequent stability Study
B. Set the system status to completed
C. Lock all the storage conditions
D. Lock the test schedule
E. Set the usage decision for all stability inspection lots
A. Audit component according to different criteria
B. Tabular Overview lists of audit components
C. The QM-STI(Quality Management- Statistic Interface)report
D. Detailed audit valuation
A. The inspection occurs after the release of the sales order.
B. The inspection occurs after the good issue in posted
C. The inspection occurs before the good issue in posted
D. The inspection occurs after the transport order is quit.
A. Assign the notification type to the inspection type.
B. Activate the work flow template
C. Define the defect report type
D. Activate reference to Existing notifications.
A. Early warning processes
B. Control charts
C. Info structure
D. Structure figures