5V0-22.21試験無料問題集「VMware vSAN Specialist 認定」
A vSAN architect is using the vSAN Sizer to build an All-Flash vSAN cluster for an accounting company. The architect is trying to determine why 12 TBs are set aside for system overhead and is reviewing the items that are include in the overhead capacity.
Which two items are included? (Choose two.)
Which two items are included? (Choose two.)
正解:D,E
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
An enterprise company is carrying out a planned yearly power test on specific platforms, and the infrastructure administrator has been asked to power down a vSAN 7.0 U1 cluster containing production virtual machines. The management workloads, such as the vCenter Server, are running on a different platform.
Which action should the vSAN administrator take to ensure it is safe to complete this task?
Which action should the vSAN administrator take to ensure it is safe to complete this task?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A vSAN administrator is looking forward to managing hypervisor, server drivers, and firmware all in one cluster image using vLCM. The vSAN administrator edits the desired Image and selects the desired ESXi version and Vendor Addon but is unable to add any firmware.
Why is there no firmware available to add to the image?
Why is there no firmware available to add to the image?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A large enterprise has a main campus with two 8-Node vSAN 7.0 U1 clusters and 50 remote sites, each containing one 2-Node cluster. An administrator configures a vLCM desired image for lifecycle management, and vLCM had determined that all the clusters are in need of remediation.
How would vLCM enhance the remediation operation in this situation?
How would vLCM enhance the remediation operation in this situation?
正解:B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
An administrator is preparing maintenance on a host in a vSAN cluster, and the maintenance is expected to take less than one hour. The administrator is considering using the "Full Data Migration" but understands that this can be time consuming and also has additional capacity and performance considerations.
Which action would alleviate these concerns?
Which action would alleviate these concerns?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A large financial company has an existing vSAN 7.0 U1 cluster containing production virtual machines and the vCenter Server. The cluster needs to be physically moved to another location within the datacenter to allow new racks to be installed, so the platform needs to be powered down.
Which action should the vSAN administrator take to perform this procedure safely?
Which action should the vSAN administrator take to perform this procedure safely?
正解:B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)