5V0-22.23試験無料問題集「VMware vSAN Specialist (v2) 認定」
Due to a planned power outage, an administrator decides to shut down the vSAN cluster using the Shutdown Cluster Wizard. The administrator starts by checking the vSAN health service to confirm the cluster is healthy and then powers off all virtual machines (VMs) including vCLS VMs.
Which step needs to be taken before starting the Shutdown Cluster Wizard?
Which step needs to be taken before starting the Shutdown Cluster Wizard?
正解:A
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A vSAN administrator has a cluster configured with a Storage Pool that was moved to a new physical DC.
Upon checking on the vSAN cluster health status, one of the ESXi hosts has two storage devices in a degraded state and must be replaced.
What must the vSAN administrator do to restore the health of the vSAN cluster with minimum risk?
Upon checking on the vSAN cluster health status, one of the ESXi hosts has two storage devices in a degraded state and must be replaced.
What must the vSAN administrator do to restore the health of the vSAN cluster with minimum risk?
正解:B
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
A customer has deployed a new vSAN Cluster with the following configuration:
* 6 x vSAN ReadyNodes
* All Flash
* 12 TB Raw Storage
* vSAN 8 is deployed with ESA.
VMs are configured with a RAID-5 VM policy.
During failure testing, before the new platform is placed into production one of the ESXi hosts is made unavailable.
Which RAID-5 data placement schemes will vSAN use with this failure condition?
* 6 x vSAN ReadyNodes
* All Flash
* 12 TB Raw Storage
* vSAN 8 is deployed with ESA.
VMs are configured with a RAID-5 VM policy.
During failure testing, before the new platform is placed into production one of the ESXi hosts is made unavailable.
Which RAID-5 data placement schemes will vSAN use with this failure condition?
正解:C
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)