An administrator has been tasked with increasing the available capacity within an existing VMware Cloud Foundation (VCF) environment to support the deployment of production workloads. The VCF environment consists of a single VI Workload Domain (which is using vSphere Lifecycle Manager images as the update method) with only a single vSAN Cluster called Prod-01. Two new hosts have been added to SDDC Manager inventory for the capacity expansion. The new hosts have identically configured CPU and RAM to the hosts in Prod-01. VMFS on FC is the required principal storage option.
Which process must the administrator complete to increase the available capacity without the need for additional management components?
Which process must the administrator complete to increase the available capacity without the need for additional management components?
正解:D
解答を投票する
解説: (GoShiken メンバーにのみ表示されます)
An architect needs to create a VMware Cloud Foundation (VCF) VI Workload Domain design with the following requirements:
* Multiple availability zones
* Five nodes per availability zone to host the workloads
* vSAN storage must be used as a principal storage
* vSAN must be using Original Storage Architecture (OSA)
What is the maximum accepted round-trip latency and minimum bandwidth between the zones to support the requirements?
* Multiple availability zones
* Five nodes per availability zone to host the workloads
* vSAN storage must be used as a principal storage
* vSAN must be using Original Storage Architecture (OSA)
What is the maximum accepted round-trip latency and minimum bandwidth between the zones to support the requirements?
正解:D