VMCE_V10試験無料問題集「Veeam Certified Engineer (VMCE) V10 認定」
The backup administrator configured replication for a VM from Data Center 1 to Data Center 2, which runs every day at 1 a.m. A power surge takes out Data Center 1 at 7 a.m.
and the administrator fails over the
replica at 8 a.m. When the power comes back on, the administrator performs the "failback" action at 2 p.m. and checks the state of the original VM. They recognize that not all data is available. What is missing?
and the administrator fails over the
replica at 8 a.m. When the power comes back on, the administrator performs the "failback" action at 2 p.m. and checks the state of the original VM. They recognize that not all data is available. What is missing?
正解:D
解答を投票する