When the Huawei air-cooled air-conditioning compressor is turned on for the first time, the crankcase heating belt needs to be warmed up for more than ( ) hours.

The sleep of the UPS module is to turn off the inverter of some modules when the system load rate is low and stable, so that some modules go to sleep, and the remaining un-hibernated modules bear a larger load to solve the problem of the low efficiency when the system load is light.

The NetCol5000-C air conditioner does not support the power module plug and play maintenance.

When installing the Huawei air-cooled air conditioner, the refrigerant pipeline positive pressure is required to be () hours.

When the single machine is working, after the function of power-off of the ups2000-g machine is prohibited, the PL port has no output when overload or battery power is low.

The dry contact signal of the UPS5000-E does not support the remote emergency stop function.

The following statement about the integration UP5000-E-120K-HASBS, which is wrong?

After the air conditioner is commissioned, the indoor temperature is in a reasonable state, and the suction pressure is not lower than ( ).

When the internal short circuit of the battery occurs, the faulty battery charging voltage (), the open circuit voltage is low (generally less than 1V/cell).