070-470試験無料問題集「Microsoft Recertification for MCSE: Business Intelligence 認定」

DRAG DROP
You have a single SQL Server 2008 R2 Analysis Services (SSAS) instance. You are planning to upgrade the instance to SQL Server 2012.
You need to import an existing PowerPivot workbook to create a tabular project.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
正解:
---
A SQL Server Analysis Services (SSAS) cube contains a large measure group. The fact table supporting the measure group is loaded with new data throughout the day.
You have the following requirements:
Ensure that the cube displays current data as quickly as possible.
Maximize availability of the cube.
Maximize query performance for all aggregation levels.
You need to choose a partitioning strategy that meets the requirements.
Which partitioning strategy should you choose? (More than one answer choice may achieve the goal. Select the BEST answer.)

You need to ascertain why Marc did not receive his reports.
What should you do?

DRAG DROP
You are the administrator of a SQL Server Integration Services (SSIS) catalog. You have
access to the original password that was used to create the SSIS catalog. A full database backup of the SSISDB database on the production server is made each day. The server used for disaster recovery has an operational SSIS catalog.
The production server that hosts the SSISDB database fails.
Sensitive data that is encrypted in the SSISDB database must not be lost.
You need to restore the production SSIS catalog to the disaster recovery server.
Which three steps should you perform in sequence? (To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.
正解:
You are managing a SQL Server Reporting Services (SSRS) instance in native mode. A system role named Developer Support is present on the server.
Members of the Developer Support role cannot modify the report execution timeout period.
You need to enable members of the Developer Support role to modify the report execution timeout period.
Which task should you add to the Developer Support role?

You need to create the Package Activity report.
What should you do?

You need to recommend a partitioning strategy that meets the performance requirements for CUBE1.
What should you include in the recommendation?

A large manufacturing company has manufacturing plants in many states. Each state has a dedicated SQL Server instance that stores its manufacturing data. Each SQL Server instance is configured identically and all instances have identical database structures.
You are developing a daily report that summarizes information on manufacturing activity.
The report has the following requirements:
It must have a state name as one of the report parameters.
It must provide a daily summary of manufacturing activity of a selected state.
It must require minimal development and maintenance effort.
You need to develop the report to meet the requirements.
What should you do? (More than one answer choice may achieve the goal. Select the BEST answer.)

HOTSPOT
A company maintains separate environments for test, production, and quality assurance. The company uses the project deployment model for SQL Server Integration Services (SSIS) deployments.
You create an SSIS project to perform a weekly refresh of the company's data warehouse and cubes. The project has three packages.
You need to configure the project to ensure so that the test and production teams can run each package without manually adding server-specific information.
Which program should you use?
To answer, select the appropriate program in the answer area.
正解:
You need to create the KPI in the AdhocReports project in time for the next production release cycle.
What should you do?

解説: (GoShiken メンバーにのみ表示されます)
DRAG DROP
You need to implement the requirements for the StageFactSales package.
Which four actions should you perform in sequence? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
正解:
You are developing a SQL Server Analysis Services (SSAS) tabular project. The model includes a table named Sales. The Sales table includes a single date column.
The Sales table must meet the following requirements:
- Queries must be able to return all rows. - Must be able to support four different processing schedules for different date ranges. - Date ranges must not include any overlapping data.
You need to implement a solution that meets the requirements.
What should you do?

You need to configure a parameter for the database connection string.
What should you do?

HOTSPOT
You are using a new installation of SQL Server Reporting Services (SSRS) to create three sales reports that consume data from a stored procedure. The stored procedure is defined in a Windows Azure SQL Database.
All reports must pass USA to the Country parameter of the stored procedure. Users cannot change the Country report parameter value.
You need to configure the report parameter properties.
How should you configure the report parameter properties? To answer, select the appropriate setting or settings in the answer area.
正解: