A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin.
You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents pad of the solution.
NOTE: Each correct selection is worth one point.

解説: (GoShiken メンバーにのみ表示されます)
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:

Explanation:
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?

解説: (GoShiken メンバーにのみ表示されます)
A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.
The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.
You need to configure the reservations for production.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:

Explanation:
To configure the reservations for production, you should do the following:
* Define configuration for paint reservation: You should configure the Item model group for paint. The Item model group determines the inventory policies for an item, such as reservation, tracking, and costing1. You can set the reservation policy for paint to FIFO date-controlled, which means that the inventory reservation is controlled by a sorting date according to the FIFO principle2. You can also set the Backward from ship date option, which means that the inventory reservation is controlled by the last update physical date according to the FIFO rule2.
* Define the reservation principle for paint: You should set the reservation principle to Start. This means that inventory is reserved when production starts3. This way, you can ensure that paint is available at the production station when needed
A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.
The production planner increases the lead time of an item. On the next master planning output the planner receives a cancel action message on existing purchase orders. The message includes a suggested earlier date for the planned purchase orders.
The demand for the item has not changed since the original purchase order was placed. Dynamic negative days is not used.
You need to resolve the issue.
What should you do?

A company uses Dynamics 365 Supply Chain Management.
The marketing group needs to be able to view a manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item when the cost of the BOM item is calculated.
You need to configure the functionality.
What should you do?

解説: (GoShiken メンバーにのみ表示されます)
A beverage manufacturing company is implementing Dynamics 365 Supply Chain Management.
The company will use the batch balancing functionality to create the beverages.
IngredientA must be configured for a target value of 40 with a minimum of 35 and a maximum of 45.
IngredientB must be configured to account for target value variances.
You need to configure the ingredient-based calculations
Which ingredient type should you configure for each requirement? To answer, drag the appropriate ingredient types to the correct requirements. Each ingredient type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
正解:

Explanation:
You need to configure the two lift kit subassembly cost requirements for production.
Which methods should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:

Explanation:
A company is implementing Dynamics 365 Supply Chain Management The company is a subcontractor that produces subassemblies for two major customers. CustomerA and Customers The company prioritizes CustomerA production orders to start on Mondays. The production orders may take several days to complete. Customers' orders are produced throughout the week, after CustomerA orders are completed. Work in process (W1P) must be calculated and consolidated for CustomerA and CustomerB respectively on the financial reports.
You need to configure the production requirements.
What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
正解:

Explanation:
You are a manufacturer using Druitt 365 Supply Cham Management
A new series of orders is authorized for production.
You need to identify which documents to use for the released production order.
Which document should you use tor each requirement? to answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
正解:

Explanation: