NCM-MCI-5.15試験無料問題集「Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) 5.15 認定」

A new Nutanix cluster is ready for production on a remote site with no IT staff. Changes to the infrastructure will cost money and probably cause a cluster stop. The administrator needs to perform a health check on the environment that should include:
* Network connectivity checks
* Network performance status
* Storage performance status
Which tool should be used to perform this test?

An administrator is deploying Nutanix Files 3.5 and needs to configure the sizing of the FSVMs for an increased number of concurrent SMB connections over the default 750.
What should the administrator do?

解説: (GoShiken メンバーにのみ表示されます)
An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes to a second site. The daily change rate is low. During nightly backups, the replication window is missed due to write volume.
Which two options describe the expected behavior? (Choose two.)

A customer has two mission-critical applications and needs to have them backed up to a remote location. The remote location is connected using a leased line and has an average latency of 7 ms.
Which Nutanix technology will provide the shortest RPO possible?

解説: (GoShiken メンバーにのみ表示されます)
A customer has the following requirement for a Nutanix cluster:
Must support high-performance Nutanix Volumes iSCSI workloads
Must utilize AHV nodes
Must use 10 GbE interface
How should the customer optimize networking?

Refer to the exhibit.

A Microsoft SQL 2016 deployment is shown in the exhibit. The administrator receives user reports that database queries take too long to return.
Which optimization should be made to this configuration to improve performance?

An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
* Site A is the Primary Site
* Site B is the Secondary inactive Site, no VMs running
* Site A is fully in Production
* Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.
How should the administrator accomplish this?

解説: (GoShiken メンバーにのみ表示されます)