C_FSUTIL_60試験無料問題集「SAP Certified Associate - Utilities with SAP ERP 6.0 (C_FSUTIL_60) 認定」
The potential proration of charges that are calculated during billing can be determined based on different criteria, such as a date interval or to the day.
Which of the following indicators do you use to control the way in which the billing period is utilized for charge calculation?
Which of the following indicators do you use to control the way in which the billing period is utilized for charge calculation?
正解:B
解答を投票する
You are attempting to create master data to test the billing process. When you perform a full installation for the device, you must input the rate type for each billing-relevant register. You enter a valid value in the rate field and choose enter.
Why might the system return an error message and prevent you from saving?
Why might the system return an error message and prevent you from saving?
正解:A
解答を投票する
In the attached image you can see a double-rate meter (Dev. 1), controlled by a ripple control receiver (ARCR). One of the registers in Dev. 1 has a relationship with a register in another meter (Dev. 2). Consumption in Dev. 2 is automatically deducted from consumption in the main register in Dev. 1 during the billing run.

What type of register relationship is described here?

What type of register relationship is described here?
正解:D
解答を投票する