質問 40
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct Answers to this question.

  • A. An entry in the object list
  • B. An activity in the notification header
  • C. A task in the notification item
  • D. A text in the subject long text screen

正解: B

 

質問 41
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note:
There are 2 correct Answers to this question.

  • A. Maintenance planner group
  • B. Maintenance work center
  • C. Organizational unit
  • D. Storage location

正解: B,D

 

質問 42
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct Answers to this question.

  • A. By assigning a PFCG role with an SAP Fiori catalog
  • B. By assigning a portal role with an SAP Fiori catalog
  • C. By assigning a PFCG role with an SAP Fiori tile group
  • D. By assigning the tiles directly

正解: A,C

 

質問 43
What happens if you change the primary key of a functional location?

  • A. The functional location is immediately assigned to a new superior functional location when the new label is entered.
  • B. The user must decide whether the functional location is assigned to a new superior functional location.
  • C. Changing the superior functional location via alternative labeling is not possible.
  • D. The user must define a new labelling system for the new primary key.

正解: A

 

質問 44
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question.

  • A. Manufacturer data
  • B. Warranty
  • C. Serial data
  • D. Configuration

正解: C,D

 

質問 45
Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct Answers to this question.

  • A. Orders always need to be combined with notifications.
  • B. More than one operation must always be maintained in the maintenance order.
  • C. Orders and notifications can be used in combination.
  • D. Notifications are used for documentation of technical findings and activities performed.
  • E. Maintenance orders can be created as immediate orders without any planning.

正解: C,D,E

 

質問 46
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? Note:
There are 2 correct Answers to this question.

  • A. You have access to the SAP S/4HANA back-end system.
  • B. You do NOT have access to the SAP S/4HANA back-end system.
  • C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.

正解: B,C

 

質問 47
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time - key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 2 correct Answers to this question.

  • A. Set the offset to 3 months.
  • B. Set the call horizon to 90 days.
  • C. Set the call horizon to 25%.
  • D. Set the call horizon to 75%.

正解: C

 

質問 48
What is the correct receiver object type for the settlement of a refurbishment order?

  • A. The WBS element
  • B. The fixed asset
  • C. The cost center
  • D. The material

正解: D

 

質問 49
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct Answers to this question.

  • A. Assign a production resource tool (PRT) to the operation.
  • B. Verify planned and actual costs.
  • C. Complete the malfunction report.
  • D. Find malfunction records already created in a list.
  • E. Plan repair work for the responsible work center.

正解: C,D,E

 

質問 50
You want to assign your maintenance orders to a WBS element. Which of the following statements are correct? Note: There are 2 correct Answers to this question.

  • A. The assignment is always made to a network activity of the WBS element.
  • B. The assignment always has to be made manually.
  • C. The assignment can be made automatically.
  • D. The settlement receiver WBS element can be determined automatically.

正解: C,D

 

質問 51
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Select the time segment check box for the equipment category.
  • B. Define an additional business view for the equipment category.
  • C. Define the corresponding history-related field for the equipment reference category.
  • D. Activate the change documents for the equipment category.

正解: D

 

質問 52
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question.

  • A. Maintenance plan header
  • B. Maintenance plan item
  • C. Equipment task list
  • D. Measurement document
  • E. Work order confirmation

正解: B,D,E

 

質問 53
Which functionalities are available in the SAP Asset Manager for a maintenance worker? Note: There are
2 correct Answers to this question.

  • A. Confirm time sheets. Attach documents
  • B. Change BOM. Create a work order on the ESRI map
  • C. Schedule resources. Change task list
  • D. Display maps. Display and maintain technical objects

正解: A,D

 

質問 54
To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question.

  • A. Planner group
  • B. Equipment
  • C. Work center
  • D. Business partner

正解: C,D

 

質問 55
You want to create a new functional location. Which configuration steps are required? Note: There are 2 correct Answers to this question.

  • A. Define the functional location category.
  • B. Define the reference functional location.
  • C. Define the structure indicator.
  • D. Define the number range for the functional location category.

正解: A,C

 

質問 56
You need to create a new functional location. Which actions can you perform with the SAP Fiori app
"Create Technical Object"? Note: There are 3 correct Answers to this question.

  • A. Assign a subordinate piece of equipment.
  • B. Change a reference location.
  • C. Edit classification data and characteristics.
  • D. Create a task list for functional location.
  • E. Assign documents.

正解: B,C,E

 

質問 57
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%?

  • A. It will be 5 days earlier.
  • B. It is not shifted.
  • C. It is postponed by 5 days.
  • D. It is postponed by a full cycle (100%).

正解: C

 