合格させるC_TS413_2020ブレーン問題集で更新されたのは認定サンプル問題
オンラインC_TS413_2020テストブレーン問題集とテストエンジン
質問 40
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct Answers to this question.
- A. An entry in the object list
- B. An activity in the notification header
- C. A task in the notification item
- D. A text in the subject long text screen
正解: B
質問 41
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note:
There are 2 correct Answers to this question.
- A. Maintenance planner group
- B. Maintenance work center
- C. Organizational unit
- D. Storage location
正解: B,D
質問 42
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct Answers to this question.
- A. By assigning a PFCG role with an SAP Fiori catalog
- B. By assigning a portal role with an SAP Fiori catalog
- C. By assigning a PFCG role with an SAP Fiori tile group
- D. By assigning the tiles directly
正解: A,C
質問 43
What happens if you change the primary key of a functional location?
- A. The functional location is immediately assigned to a new superior functional location when the new label is entered.
- B. The user must decide whether the functional location is assigned to a new superior functional location.
- C. Changing the superior functional location via alternative labeling is not possible.
- D. The user must define a new labelling system for the new primary key.
正解: A
質問 44
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question.
- A. Manufacturer data
- B. Warranty
- C. Serial data
- D. Configuration
正解: C,D
質問 45
Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct Answers to this question.
- A. Orders always need to be combined with notifications.
- B. More than one operation must always be maintained in the maintenance order.
- C. Orders and notifications can be used in combination.
- D. Notifications are used for documentation of technical findings and activities performed.
- E. Maintenance orders can be created as immediate orders without any planning.
正解: C,D,E
質問 46
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? Note:
There are 2 correct Answers to this question.
- A. You have access to the SAP S/4HANA back-end system.
- B. You do NOT have access to the SAP S/4HANA back-end system.
- C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
正解: B,C
質問 47
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time - key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 2 correct Answers to this question.
- A. Set the offset to 3 months.
- B. Set the call horizon to 90 days.
- C. Set the call horizon to 25%.
- D. Set the call horizon to 75%.
正解: C
質問 48
What is the correct receiver object type for the settlement of a refurbishment order?
- A. The WBS element
- B. The fixed asset
- C. The cost center
- D. The material
正解: D
質問 49
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct Answers to this question.
- A. Assign a production resource tool (PRT) to the operation.
- B. Verify planned and actual costs.
- C. Complete the malfunction report.
- D. Find malfunction records already created in a list.
- E. Plan repair work for the responsible work center.
正解: C,D,E
質問 50
You want to assign your maintenance orders to a WBS element. Which of the following statements are correct? Note: There are 2 correct Answers to this question.
- A. The assignment is always made to a network activity of the WBS element.
- B. The assignment always has to be made manually.
- C. The assignment can be made automatically.
- D. The settlement receiver WBS element can be determined automatically.
正解: C,D
質問 51
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Select the time segment check box for the equipment category.
- B. Define an additional business view for the equipment category.
- C. Define the corresponding history-related field for the equipment reference category.
- D. Activate the change documents for the equipment category.
正解: D
質問 52
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question.
- A. Maintenance plan header
- B. Maintenance plan item
- C. Equipment task list
- D. Measurement document
- E. Work order confirmation
正解: B,D,E
質問 53
Which functionalities are available in the SAP Asset Manager for a maintenance worker? Note: There are
2 correct Answers to this question.
- A. Confirm time sheets. Attach documents
- B. Change BOM. Create a work order on the ESRI map
- C. Schedule resources. Change task list
- D. Display maps. Display and maintain technical objects
正解: A,D
質問 54
To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question.
- A. Planner group
- B. Equipment
- C. Work center
- D. Business partner
正解: C,D
質問 55
You want to create a new functional location. Which configuration steps are required? Note: There are 2 correct Answers to this question.
- A. Define the functional location category.
- B. Define the reference functional location.
- C. Define the structure indicator.
- D. Define the number range for the functional location category.
正解: A,C
質問 56
You need to create a new functional location. Which actions can you perform with the SAP Fiori app
"Create Technical Object"? Note: There are 3 correct Answers to this question.
- A. Assign a subordinate piece of equipment.
- B. Change a reference location.
- C. Edit classification data and characteristics.
- D. Create a task list for functional location.
- E. Assign documents.
正解: B,C,E
質問 57
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%?
- A. It will be 5 days earlier.
- B. It is not shifted.
- C. It is postponed by 5 days.
- D. It is postponed by a full cycle (100%).
正解: C
質問 58
......