質問 # 47
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- B. Push and Pull production models are used by the optimizer.
- C. Finite heuristics can achieve demand prioritization and pegging.
- D. Planning results can be generated faster by the optimizer.
正解:B、C
質問 # 48
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?
- A. Download the Initial Problem Report in the Data Integration app.
- B. Navigate to the Manage Master Data app and open the Log.
- C. Navigate to the Master Data Workbook in Excel and open the Log.
- D. Download the Rejection Report in the Data Integration app.
正解:B
質問 # 49
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
- A. SOURCECUSTOMER
- B. SOURCELOCATION
- C. SOURCECUSTGROUP
- D. SOURCEPRODUCTION
正解:A、B
質問 # 50
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Recommended Safety Stocks from Multistage Inventory Optimization
- B. Sales Order Quantities (both historical and future open orders)
- C. Future Consensus Forecasts and Lagged Forecast Snapshots
- D. Forecast Error CV Calculated by Manage Forecast Error Calculations app
正解:A、C
質問 # 51
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
- B. Minimum capacity utilization will result in pull production occurring.
- C. Capacity leveling will be possible for production and storage resources.
- D. Excess stock can be generated and will need to be staged in an overflow warehouse.
正解:A、D
質問 # 52
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Inventory Optimization
- B. Sales and Operations Planning
- C. Response Planning
- D. Demand Sensing
- E. Demand Driven Replenishment
正解:A、B、D
質問 # 53
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Embedded, on-the-fly demand analytics
- B. Detailed statistical analysis of demand data using predictive analytics tools
- C. Consideration of demand-driven analysis for buffer positioning.
- D. Demand sensing of demand data using predictive analytics tools
正解:A、B
質問 # 54
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Transportation Lead Time Error CV
- B. Target Service Level
- C. Minimum Lot Size
- D. Holding Cost Percentage
正解:B、C
質問 # 55
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.
- A. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
- B. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
- C. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
- D. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
正解:A、D
質問 # 56
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Aggregated constraints
- B. Maximum lot size
- C. Adjusted transport receipts
- D. Transportation lead times
- E. Minimum lot size
正解:B、C、D
質問 # 57
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Model inventory turns based on Target Safety stocks
- B. Simulate heuristics run in Supply Review stage
- C. Simulate demand sensing inputs for Supply Review
- D. Simulate statistical forecast at the Demand Review stage
正解:B、D
質問 # 58
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- B. These filters can be used together with attribute totals in the same planning view.
- C. These filters are always applied based on the values stored in the database.
- D. You can add (or delete) planning objects to a planning view after these filters are applied.
- E. You can only apply one value-based filter per planning view.
正解:A、C、E
質問 # 59
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Enter the product family to which the new product belongs
- B. Copy the launch dimension from the reference product to the new product
- C. Enter the Phase-out Start Date and Phase-out End Date
- D. Create planning objects for new combinations in the app
正解:B、D
質問 # 60
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
- A. If necessary target key figures values are disaggregated.
- B. If necessary source key figures values are disaggregated.
- C. Copying multiple key figures can be processed sequentially.
- D. Copying multiple key figures on different planning levels is not possible.
正解:B、C
質問 # 61
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
- B. Set up a three-tier landscape using transport, starting from the development system to test and production.
- C. Create additional test planning areas in the production system to support cutover needs.
- D. Create additional planning areas in the test system to support training needs.
正解:A、B
質問 # 62
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.
- A. Merging two locations into a new location
- B. Changing customer sources and reassigning customers to new DCs
- C. Using the realignment run to identify obsolete data
- D. Removing outliers from the sales history of a reference product before transferring its sales to a new product
正解:A、B
質問 # 63
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for manually editable key figures.
- B. Fixing is possible for a certain quantity of a key figure value.
- C. Fixing is possible for a certain period, including all child values in the hierarchy.
- D. Fixing is possible for system editable key figures.
正解:C、D
質問 # 64
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Reorder Point
- B. Target Cycle Stock
- C. Target Pipeline Stock
- D. Recommended Safety Stock
- E. Component Usage
正解:B、C、D
質問 # 65
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Key figure type
- B. Modified date
- C. Attributes
- D. Scenario ID
- E. Reason code
正解:B、C、E
質問 # 66
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A currency conversion key figure, such as exchange rate
- B. A forecast metric key figure, such FCSTMAPE
- C. A unit of measure key figure, such as UOMCONVERSIONFACTOR
- D. A special key figure marked as an aggregate key figure (aggregate constraint)
正解:C、D