質問 46
Which distribution methods can you use to replicate transactional data from an SAP ERP system to SAP Extended Warehouse Management? There are 2 correct answers to this question.
- A. Distribution via post processing framework (PPF) actions
- B. Manual distribution
- C. Immediate distribution at document creation
- D. Core Interface (GIF) distribution model
正解: B,C
質問 47
Which of the following are putaway strategies in EWM? There are 4 correct answers to this question.
- A. Next empty bin
- B. Open storage
- C. Pallet
- D. FIFO
- E. Manual
- F. Bulk
正解: A,C,E,F
質問 48
Which objects can you add to the warehouse cockpit ? Note : There are 2 correct answers to this question
- A. Calculated measurement services
- B. Tailored measurement services
- C. Basic measurement services
- D. Alerts from alert management
正解: A,B
質問 49
EWM can be deployed as follows:
There are 2 correct answers to this question.
- A. either as a component of the SAP SCM 5.0/SCM 2007 server environment, or as an add-on to an SAP ERP server environment
- B. only in a standalone, decentralized server environment
- C. as a component of an SAP SCM 5.0/SCM 2007 server environment
- D. only in the SAP SCM server environment
正解: A,C
質問 50
In EWM Travel Distance Calculation, when calculating the distance while creating the warehouse order, the system estimates the following values.
There are 3 correct answers to this question.
- A. Instead of the known position of the resource, a default distance to be covered to reach the first position in a storage type is specified
- B. For the speed, the system uses the speed of the slowest resource (pessimistic approach)
- C. The route network used (if available) contains all defined routes with resource type restrictions
- D. For the speed, the system uses the speed of the fastest resource (Optimistic approach)
- E. The route network used (if available) contains all defined routes without resource type restrictions
正解: A,B,E
質問 51
What transactions in the ERP system can generate EWM-relevant posting changes? There are 2 correct answers to this question.
- A. MIGO
- B. VLMOVE
- C. VA01
- D. ME21N
正解: A,B
質問 52
A VAS order is created with reference to: There are 2 correct answers to this question.
- A. A Picking List
- B. A manufacturing request
- C. An outbound delivery order
- D. The required packaging specification
正解: C,D
質問 53
With SAP S/4HANA embedded EWM OR EWM 9.5 , you can skip certain document categories Which document category combination is still mandatory ?
- A. An outbound delivery request and an outbound delivery
- B. An outbound delivery request and an outbound delivery order
- C. A production material request and a stock transfer
- D. An outbound delivery order and an outbound delivery
正解: D
質問 54
Work order can be used in the following processes? There are 3 correct answers to this question.
- A. Packing
- B. Quality Inspection
- C. Material staging
- D. Yard management
- E. Counting
- F. RFID
正解: A,B,E
質問 55
What are the two types of tags in use today in RFID? There are 2 correct answers to this question.
- A. passive
- B. local
- C. active
- D. cpu-direct
- E. hard-wired
正解: A,C
質問 56
What documents can be found in the goods issue process? There are 3 correct answers to this question.
- A. Sales order
- B. Production order
- C. Billing document
- D. Outbound delivery
- E. Transfer order
正解: A,C,D
質問 57
Which quality management activities are performed during inbound processing? There are 2 correct answers to this question.
- A. Recurring inspection
- B. Counting
- C. Quality inspection
- D. Sample size maintenance
正解: B,C
質問 58
Which of the following are considered warehouse activities? Please select all the correct answers that apply.
- A. picking
- B. scrapping
- C. stock transfer within the warehouse
- D. putaway
- E. posting changes
正解: A,B,C,D,E
質問 59
When you create a direct outbound delivery order, where can availability checks happen? There are 2 correct answers to this question.
- A. In SAP TM
- B. In SAP APO
- C. In SAP CRM
- D. In SAP EWM
正解: B,D
質問 60
EWM 5.0 can be used with the following releases? Choose the correct answer.
- A. From SAP R/3 3.OF forward with Service Pack 06
- B. From SAP R/3 4.6C forward with Service Pack 06
- C. Only SAP ECC 6.0 and beyond
- D. Only SAP ECC 5.0 and beyond
正解: B
質問 61
Which two of the following types of labor time are tracke in Labor management? There are 2 correct answers to this question.
- A. Schedule Time
- B. Direct Labor
- C. Unproductive Time
- D. Indirect Labor
正解: B,D
質問 62
RF Function Key F6 is used for which function? Please choose the correct answer.
- A. More
- B. Clear
- C. List
- D. Back
正解: B
質問 63
Which physical inventory procedure is storage-bin-specific only? There are 2 correct answers to this question.
- A. Ad hoc physical inventory procedure
- B. Period physical inventory procedure
- C. Zero stock physical inventory procedure
- D. Low stock physical inventory procedure
正解: A,D
質問 64
Which physical inventory procedure is storage-bin-specific only?
- A. Periodic physical inventory procedure
- B. Ad hoc physical inventory procedure
- C. Zero stock physical inventory procedure
- D. Low stock physical inventory procedure
正解: B,D
質問 65
Where do you enable opportunistic cross-docking ?
- A. In the product and the storage type
- B. In the warehouse and the document type
- C. In the product and the warehouse process type
- D. In the warehouse and the product
正解: D
質問 66
What is a staging area ?
Note : There are 2 correct answers to this question.
- A. An area used for the interim storage of goods in the warehouse
- B. A section in storage type with the Staging area Group storage type rule
- C. A storage type in the warehouse reserved for production
- D. The inbound section of the packing work center
正解: A,C
質問 67
What can a mobile user do when working with semi-system-guided processing ?
- A. Select the source bin
- B. Select the handling unit to be processed
- C. Select the batch
- D. Create ad hoc warehouse tasks
正解: B
質問 68
Rack, Open, Shelf, Damage represents the? Please choose the correct answer.
- A. None
- B. Stock Types
- C. Plant Type
- D. Storage Types
正解: D
質問 69
Which of the following are product warehouse tasks during putaway with process oriented storage control?
- A. The final process step
- B. The first process step
- C. All process steps
- D. The first and final process steps
正解: D
質問 70
......
SAP C-S4EWM-1909 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
検証済みのC-S4EWM-1909問題集と解答で一年間無料最速更新:https://www.goshiken.com/SAP/C-S4EWM-1909-mondaishu.html