質問 # 47
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level
  • B. The controller can determine actual cost surcharges.
  • C. Goods receipts for external services can be entered.
  • D. The planner can change estimated costs only at the header level
  • E. The assignment of the notification to the maintenance order header cannot be deleted.

正解:A、C、E

解説:
A maintenance order with status REL means that the order is released and ready for execution. At this stage, the following characteristics apply:
A . Goods receipts for external services can be entered. This is true because external services are procured through purchase orders that are linked to the maintenance order. The service performer can post service entry sheets to record the executed work and consumable materials. These service entry sheets can be approved and posted as goods receipts for external services1.
B . The planner can change planned costs at the operation level. This is false because once the order is released, the planned costs are frozen and cannot be changed by the planner. The planner can only change the estimated costs at the header level2.
C . The planner can change estimated costs only at the header level. This is true, but it is not a characteristic of a released order. The planner can change the estimated costs at any time, even before the order is released2.
D . The controller can determine actual cost surcharges. This is true because the controller can use the business function LOG_EAM_CI_7 to calculate and post actual cost surcharges for maintenance orders. This function can be used for orders with status REL or TECO3.
E . The assignment of the notification to the maintenance order header cannot be deleted. This is true because the notification is the source document for the maintenance order and provides the reason for the order. The notification can only be deleted if the order is deleted or set to status CRTD. Reference: 1: Lean and Limit Value Services in Maintenance Order 2: Maintenance Order Cost Analysis 3: Actual Cost Surcharges for Maintenance Orders : Notification Assignment to Maintenance Order


質問 # 48
How do you map a counter replacement in SAP S/4HANA Asset Management?

  • A. Assign a catalogue type for counter replacement to the measuring point category.
  • B. Create a new measurement document marked as a counter replacement.
  • C. Create a new measurement document and assign a valuation code for counter replacement.
  • D. Deactivate the current counter and create a new counter.

正解:C

解説:
Explanation
A counter is a device that measures the performance or usage of a technical object, such as a machine, a vehicle, or a pump. A counter replacement is a process that involves replacing a defective or outdated counter with a new one. A counter replacement can affect the maintenance planning and scheduling of the technical object, as some maintenance tasks may depend on the counter readings1.
To map a counter replacement in SAP S/4HANA Asset Management, you need to create a new measurement document and assign a valuation code for counter replacement. A measurement document is a record that contains the measurement readings of one or more counters or measuring points. A valuation code is a key that indicates the quality or validity of the measurement reading, such as OK, Not OK, Estimated, or Counter Replacement2.
By creating a new measurement document and assigning a valuation code for counter replacement, you can inform the system that the counter has been replaced and the previous counter readings are no longer valid.
The system will then use the new counter readings for maintenance planning and scheduling purposes. You can also enter additional information about the counter replacement, such as the reason, the date, and the time3.
The other options are incorrect because:
Deactivate the current counter and create a new counter: This option is not recommended, as it will create a new counter object in the system and break the link with the previous counter object. This will result in data inconsistency and loss of historical information about the counter readings and maintenance activities3.
Create a new measurement document marked as a counter replacement: This option is incomplete, as it does not specify how to mark the measurement document as a counter replacement. You need to use the valuation code field to indicate the counter replacement3.
Assign a catalogue type for counter replacement to the measuring point category: This option is irrelevant, as it does not involve creating a new measurement document. A catalogue type is a key that defines the structure and content of a catalogue, which is a collection of codes and texts that describe the characteristics of a technical object, such as damage, cause, or activity. A measuring point category is a key that defines the attributes and functions of a measuring point, which is a physical or logical location where a measurement is taken.
References: 1: Counter (SAP Library - Glossary) 2: Measurement Document (SAP Library - Glossary) 3:
Counter Replacement - SAP Help Portal : Catalog Type (SAP Library - Glossary)


質問 # 49
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to thisquestion?

  • A. It provides only HTML5-based apps
  • B. It is based on an SAP Fiori tile catalog.
  • C. It can be assigned directly to the user via personalization
  • D. It is assigned via a portal role.

正解:B、C

解説:
Explanation
A SAP Fiori tile group is a subset of apps from one or more catalogs that are displayed on the user's entry page of the SAP Fiori launchpad1. A tile group has the following characteristics:
It is based on an SAP Fiori tile catalog. A catalog is a logical group of apps or tiles that defines the set of all tiles that users can use to personalize the home page2. A group can contain apps from different catalogs, depending on the user's role and authorization1.
It can be assigned directly to the user via personalization. The user can personalize the entry page by adding or removing apps to pre-delivered groups or self-defined groups2. The user can also reorder the groups and tiles according to their preference1.
It does not provide only HTML5-based apps. A tile group can contain apps that are based on different technologies, such as SAPUI5, Web Dynpro ABAP, or SAP GUI transactions1.
It is not assigned via a portal role. A tile group is assigned to the user's role via the SAP Role Maintenance transaction PFCG2. A portal role is a different concept that is used in the SAP Enterprise Portal to define the access rights and content for portal users.
References: Configure the Fiori Launchpad Tiles using Catalogs & Groups, Setup of Catalogs, Groups, and Roles in the SAP Fiori Launchpad, [Portal Roles]


質問 # 50
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

  • A. An Inspection Plan and a technical object must be assigned to the same class.
  • B. An object list must have been generated manually or automatically.
  • C. A checklist type must be assigned to the maintenance order header.
  • D. A PM task list with inspection point type must be assigned to the maintenance order

正解:A、B

解説:
A . An Inspection Plan and a technical object must be assigned to the same class. This is true because the inspection plan and the technical object must have matching classification characteristics for the inspection checklist generation. The class defines the characteristics that are relevant for the inspection plan and the technical object1.
B . A PM task list with inspection point type must be assigned to the maintenance order. This is false because the inspection checklist generation does not depend on the PM task list. The inspection checklist is based on the QM inspection plan, which is a different type of task list2.
C . An object list must have been generated manually or automatically. This is true because the object list contains the technical objects that will be checked for matching inspection plans. The object list can be generated from the header object of the order, and objects from the maintenance plan item3.
D . A checklist type must be assigned to the maintenance order header. This is false because the checklist type must be assigned to the maintenance order operation, not the header. The checklist type defines the inspection lot origin and the inspection type for the inspection checklist4. References: 1: Explaining Inspection Checklists 2: Inspection Lot 3: Object List and Inspection Checklist 4: Checklist Type in Task List Operation


質問 # 51
A Task List contains two operations:
* Every 3 MON: pump inspection
* Every 24 MON. pump replacement
When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

  • A. Create a task list hierarchy
  • B. Set the lead float
  • C. Create a cycle set sequence
  • D. Assign different hierarchy levels

正解:C

解説:
A cycle set sequence is a feature that allows you to combine several multiple counter plan cycles in a set and determine the order in which the system considers the cycle sets for scheduling. A multiple counter plan is a maintenance plan that is based on one or more performance-based or time-based cycles1.
In this case, you can create a cycle set sequence with two cycles:
Cycle 1: Every 3 MON: pump inspection
Cycle 2: Every 24 MON: pump replacement
You can assign a different maintenance item and task list to each cycle, and specify the repetition factor for each cycle. The repetition factor determines how many times the cycle is repeated before the next cycle in the sequence is considered. For example, if you set the repetition factor of cycle 1 to 8, the system will schedule the pump inspection 8 times before scheduling the pump replacement.
By creating a cycle set sequence, you can achieve the requirement that when replacing the pump, the operation pump inspection will be ignored. The system will only generate a call object for the maintenance item that is assigned to the current cycle set. Therefore, when the pump replacement is due, the system will not generate a call object for the pump inspection.
The other options are incorrect because:
Assign different hierarchy levels: Hierarchy levels are used to structure the task list operations into groups and subgroups. They do not affect the scheduling of the task list operations.
Set the lead float: Lead float is a time buffer that is added to the start or finish date of a task list operation. It does not affect the scheduling of the task list operations.
Create a task list hierarchy: A task list hierarchy is a structure that contains several task lists that are linked together by a superior task list. It does not affect the scheduling of the task list operations.
References: 1: Cycle Set Sequence in Multiple Counter Plan - SAP Help Portal


質問 # 52
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

  • A. Work center
  • B. Maintenance plan
  • C. Planner group
  • D. Business partner

正解:A、D

解説:
A personnel number is a unique identifier for an employee in the SAP system. A personnel number can be directly assigned to the following objects:
C . Work center. A work center is a location where maintenance activities are performed. A work center can have one or more personnel numbers assigned to it, which represent the employees who work at that location. The personnel numbers can be used for capacity planning, scheduling, and confirmation of maintenance orders1.
D . Business partner. A business partner is a person or an organization that has a business relationship with the company. A business partner can have one or more roles, such as customer, vendor, or contact person. A personnel number can be assigned to a business partner role, which allows the system to identify the employee who is responsible for the business partner or who acts as a contact person for the business partner2.
A personnel number cannot be directly assigned to the following objects:
A . Planner group. A planner group is a group of employees who are responsible for planning and processing maintenance orders. A planner group is assigned to a maintenance order header, but not to a personnel number. A planner group can have one or more work centers assigned to it, which in turn can have personnel numbers assigned to them3.
B . Maintenance plan. A maintenance plan is a document that defines the frequency and scope of preventive maintenance activities for technical objects. A maintenance plan is assigned to a maintenance item, which contains the technical object and the task list for the maintenance activities. A maintenance plan does not have a direct assignment to a personnel number, but it can have a planner group assigned to it, which can have work centers and personnel numbers assigned to it. References: 1: Work Center 2: Business Partner 3: Planner Group : [Maintenance Plan]


質問 # 53
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

  • A. Configuration
  • B. Manufacturer data
  • C. Serial data
  • D. Warranty

正解:B、D


質問 # 54
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Object information
  • B. Status profile
  • C. Warranty category
  • D. Measuring point category
  • E. Usage period

正解:A、B、E

解説:
Explanation
The Customizing for the functional location category includes the following settings: usage period, object information, and status profile.
The usage period defines the start and end dates of the functional location's usage. It can be used to control the validity of maintenance plans and orders, and to calculate the age of the functional location. You can define the usage period in the Customizing activity Define Functional Location Categories1.
The object information defines the additional data that can be entered for the functional location, such as manufacturer, construction type, serial number, and equipment number. You can define the object information in the Customizing activity Define Functional Location Categories1.
The status profile defines the user statuses that can be assigned to the functional location. The user statuses can be used to control the business transactions that are allowed for the functional location, such as creating orders, notifications, or measuring documents. You can define the status profile in the Customizing activity Define Status Profile2.
References: 1: Define Functional Location Categories 2: Define Status Profile


質問 # 55
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. Only one object part
  • B. Only one cause of damage
  • C. One or more object parts
  • D. One or more causes of damage.

正解:C、D

解説:
Explanation
A notification item is used to describe a problem, damage, or the activity executed in greater detail. A notification item can be assigned to one or more object parts and one or more causes of damage. An object part is a component of a technical object that is affected by a malfunction or damage. A cause of damage is a factor that leads to a malfunction or damage. You can use catalogs to enter object parts and causes of damage in a coded form. Therefore, the correct answers are B and D.
References:
SAP Help Portal - Notification Item
SAP Help Portal - Object Part
SAP Help Portal - Cause of Damage
[SAP Learning - Creating Notifications]


質問 # 56
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?

  • A. Service entry sheet
  • B. Invoice
  • C. Goods movement
  • D. Purchase order

正解:C


質問 # 57
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

  • A. Maintain settings at plant level for usage decisions.
  • B. Assign an Inspection Type to a Maintenance Order Type.
  • C. Create a control key which expects inspection characteristic assignments
  • D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

正解:A、D

解説:
To set up Inspection Checklist processing, you need to customize the following settings:
Maintain settings at plant level for usage decisions. This is required to define the default values for the usage decision codes and the follow-up actions for the inspection lots. You can do this by using the customizing activity 'Default Setting at Plant Level' under 'Quality Management→Quality Inspection→Inspection Lot Completion→Maintain Default Values for Usage Decisions'1.
Assign an Inspection Type to a Maintenance Order Type and a Planning Plant. This is required to enable the creation of inspection lots for the maintenance orders. You can do this by using the customizing activity 'Assign Inspection Type to Maintenance Order Type' under 'Plant Maintenance and Customer Service→Maintenance and Service Processing→Maintenance and Service Orders→Functions and Settings for Order Types→Assign Inspection Type to Maintenance Order Type'2.
You do not need to create a control key which expects inspection characteristic assignments or assign an Inspection Type to a Maintenance Order Type only. These are not relevant settings for the Inspection Checklist processing. References:
Set up your SAP S/4HANA system for EAM Inspection Checklists
Explaining Inspection Checklists - SAP Learning


質問 # 58
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

  • A. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • B. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
  • C. You have access to the SAP S/4HANA back-end system
  • D. You do NOT have access to the SAP S/4HANA back-end system.

正解:A、D

解説:
SAP S/4HANA Asset Management, Public Cloud Edition is a cloud-based solution that offers a simplified and standardized configuration of the system via the self-service configuration UI. You can use this UI to adjust the system settings according to your business needs. You do not have access to the SAP S/4HANA back-end system, as it is managed by SAP. SAP Asset Intelligence Network is a separate cloud-based solution that connects manufacturers, operators, and service providers of physical assets. You can use SAP Asset Intelligence Network to share and exchange asset information, but you cannot use it to configure SAP S/4HANA Cloud. Reference:
SAP S/4HANA Cloud, Public Edition - SAP Learning
SAP S/4HANA Cloud for Asset Management, Public Edition


質問 # 59
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level
  • B. The controller can determine actual cost surcharges.
  • C. Goods receipts for external services can be entered.
  • D. The planner can change estimated costs only at the header level
  • E. The assignment of the notification to the maintenance order header cannot be deleted.

正解:A、C、E

解説:
A maintenance order with status REL means that the order is released and ready for execution. At this stage, the following characteristics apply:
A . Goods receipts for external services can be entered. This is true because external services are procured through purchase orders that are linked to the maintenance order. The service performer can post service entry sheets to record the executed work and consumable materials. These service entry sheets can be approved and posted as goods receipts for external services1.
B . The planner can change planned costs at the operation level. This is false because once the order is released, the planned costs are frozen and cannot be changed by the planner. The planner can only change the estimated costs at the header level2.
C . The planner can change estimated costs only at the header level. This is true, but it is not a characteristic of a released order. The planner can change the estimated costs at any time, even before the order is released2.
D . The controller can determine actual cost surcharges. This is true because the controller can use the business function LOG_EAM_CI_7 to calculate and post actual cost surcharges for maintenance orders. This function can be used for orders with status REL or TECO3.
E . The assignment of the notification to the maintenance order header cannot be deleted. This is true because the notification is the source document for the maintenance order and provides the reason for the order. The notification can only be deleted if the order is deleted or set to status CRTD. References: 1: Lean and Limit Value Services in Maintenance Order 2: Maintenance Order Cost Analysis 3: Actual Cost Surcharges for Maintenance Orders : Notification Assignment to Maintenance Order


質問 # 60
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. Only one object part
  • B. Only one cause of damage
  • C. One or more object parts
  • D. One or more causes of damage.

正解:C、D


質問 # 61
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

  • A. Technical objects
  • B. ESRI Maps
  • C. Work orders and operations
  • D. Breakdown analytics
  • E. Cost analytics

正解:A、B、C

解説:
SAP Service and Asset Manager is a predictive asset management application that supports both maintenance and service technicians. Using this app, you can manage work orders, notifications, condition monitoring, material consumption, time management, and failure analysis1.
Some of the standard functionalities of SAP Service and Asset Manager are:
Technical objects: You can view and edit technical objects such as functional locations, equipment, and measuring points. You can also create new technical objects or link existing ones to work orders or notifications2.
Work orders and operations: You can view and edit work orders and operations assigned to you or your team. You can also create new work orders or operations, or confirm them as completed2.
ESRI Maps: You can view the location of your work orders, notifications, and technical objects on an interactive map powered by ESRI. You can also use the map to navigate to your destination or search for nearby assets2.
The other options are not standard functionalities of SAP Service and Asset Manager. Cost analytics and breakdown analytics are features of SAP Intelligent Asset Management, which is a cloud-based solution that integrates with SAP Service and Asset Manager to provide advanced insights and recommendations for asset performance3. References: 1: SAP Service and Asset Manager Overview 2: SAP Service and Asset Manager User Guide 3: SAP Intelligent Asset Management Overview


質問 # 62
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Within the SAP Fion-based background job
  • B. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
  • C. Via the SAP Fiori app "Maintenance Scheduling Board"
  • D. Via the SAP Fiori app "Manage Maintenance Order List"

正解:C、D

解説:
Explanation
The maintenance planner can perform a material availability check via the SAP Fiori app "Manage Maintenance Order List" or via the SAP Fiori app "Maintenance Scheduling Board". These apps allow the planner to check whether the components required for a maintenance order are available and update the availability status in the orders accordingly. The planner can also view the results of the material availability check in these apps. The planner cannot perform a material availability check within the SAP Fiori-based background job or via the SAP Fiori app "Manage Maintenance Planning Buckets". The background job is used to schedule material availability checks for several maintenance orders at runtime or as a recurrent batch job, but the planner cannot execute the check manually within the job. The app "Manage Maintenance Planning Buckets" is used to plan and monitor the maintenance workload and backlog, but it does not offer the functionality to perform a material availability check. References:
Schedule Material Availability Check
Manage Maintenance Order List
[Maintenance Scheduling Board]


質問 # 63
Which of the following is a prerequisite for external refurbishment?

  • A. Activate the subcontracting indicator in an external activity.
  • B. Define the order type for external refurbishment.
  • C. Select the material group for externally refurbished materials.
  • D. Assign an external work center to a maintenance order operation

正解:A

解説:
External refurbishment is the process of sending defective or worn-out spare parts to an external vendor for repair or replacement. To carry out this process, you need to create a maintenance order with an external operation that has the subcontracting indicator activated. This indicator allows you to create a purchase requisition and a purchase order for the external service. The external operation also requires an external work center, a control key, and a material component with the valuation type of the defective part. The order type for external refurbishment is not a prerequisite, but a configuration option that can be used to differentiate the process from internal refurbishment. The material group for externally refurbished materials is not relevant for the process, as the material master data is not changed by the refurbishment. The assignment of an external work center to a maintenance order operation is necessary, but not sufficient, for external refurbishment. You also need to activate the subcontracting indicator in the external activity. Reference:
Explaining Refurbishment of Spare Parts, section "Refurbishing Spare Parts Externally" Refurbishment of Repairable Spares: Integration between SAP-PM and SAP-MM, section "4.2 External Refurbishment: Major Steps"


質問 # 64
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

  • A. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • B. For the combination of order type and planner group, you can decide when reservations are created
  • C. Reservations are created only after a material availability check has been performed
  • D. All open reservations are closed when the maintenance order is set to TECO.

正解:A、B

解説:
Explanation
The planner can add stock materials in the maintenance order and decide when reservations are created.
Reservations are requests to the warehouse to keep materials ready for withdrawal at a later date. Reservations can be created automatically when the maintenance order is saved, or manually when the planner performs a material availability check. The option to create reservations automatically or manually can be configured for the combination of order type and planner group. Reservations can also be cleared when a maintenance order operation is finally confirmed. This means that the reserved quantity is reduced by the quantity withdrawn for the operation. This option can be activated in the customizing of the order type. Reservations are not closed when the maintenance order is set to TECO (technically completed). They remain open until they are either cleared by a goods issue or deleted manually. References:
Asset Management in SAP S/4HANA Cloud 2208 | SAP Blogs, section "Maintenance Order: Copy Components and Services from an External Catalog (+ demo)" SAP Help Portal: Reservations


質問 # 65
Which of the following parameters are available when you define a new maintenance plan category? Note:
There are 3 correct answers to this question.

  • A. Order type
  • B. Change documents
  • C. Completion data
  • D. Maintenance activity type
  • E. Call object

正解:A、D、E

解説:
Explanation
A maintenance plan category defines the parameters that are available when you create a maintenance plan.
The parameters include the maintenance activity type, the call object, and the order type. The maintenance activity type specifies the type of maintenance task, such as inspection, repair, or preventive maintenance. The call object determines the object that is called when the maintenance plan is executed, such as a notification, an order, or a service entry sheet. The order type defines the type of order that is created for the maintenance plan, such as a maintenance order, a service order, or a project order. The completion data and the change documents are not parameters of the maintenance plan category, but rather attributes of the maintenance plan itself. References: Elastic Compute Service:Change the category of a disk, Get Professional Support for your Cloud Business


質問 # 66
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Scheduling period
  • B. Estimated annual performance
  • C. Counter overflow reading
  • D. Start counter reading

正解:B、D

解説:
To schedule a performance-based maintenance plan, you need to specify the start counter reading and the estimated annual performance of the equipment or functional location. The start counter reading is the initial value of the counter assigned to the maintenance plan. The estimated annual performance is the expected value of the counter for one year. These parameters are used to calculate the maintenance cycle and the due date for the maintenance plan. The scheduling period and the counter overflow reading are optional


質問 # 67
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

  • A. By manually activating the corresponding Business Feature in case Best Practices are not used.
  • B. Phase-based maintenance is always active in all S/4HANA 2021 editions and above
  • C. By installing the corresponding enhancement pack and activating the related business function
  • D. Through Best Practices scope items 4HH and 4HI.

正解:A、D

解説:
Phase-based maintenance processing is a new concept that was introduced in SAP S/4HANA Cloud 2011 and SAP S/4HANA 2021. It allows you to track the life cycle of the maintenance processes using predefined phases and sub-phases, instead of system and user statuses. Phase-based maintenance processing is activated in the SAP system through the following ways:
Through Best Practices scope items 4HH and 4HI. These are the new scope items for reactive and proactive maintenance that use the phase model for maintenance requests and orders. You can activate these scope items using the SAP Activate methodology and the SAP Best Practices Explorer12.
By manually activating the corresponding Business Feature in case Best Practices are not used. If you do not use the Best Practices scope items, you can still activate the phase model for maintenance requests and orders by using the Business Feature switch in the Customizing activity Define Settings for Maintenance Processing34.
Phase-based maintenance processing is not always active in all S/4HANA 2021 editions and above, as it depends on the scope items or the Business Feature switch. Therefore, answer B is incorrect. Phase-based maintenance processing is not activated by installing the corresponding enhancement pack and activating the related business function, as this is the old way of activating new features in SAP ERP. Therefore, answer C is also incorrect. References: SAP S/4HANA Cloud release of 2011 - Asset Management (Maintenance ... and Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs


質問 # 68
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?

  • A. For stock material you always need a reservation
  • B. The pick list for materials can be printed before order release.
  • C. Material can be assigned at the order header level.
  • D. A goods issue can be entered for planned and unplanned material

正解:A、D


質問 # 69
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. The date of the final confirmation
  • B. Actual finish date of the maintenance order
  • C. Technical completion date of the maintenance order
  • D. Planned date of the next call, independent of maintenance order dates

正解:C


質問 # 70
......