無料提供されるC1000-056問題集とC1000-056リアル試験問題
IBM C1000-056実際の問題とブレーン問題集
質問 13
The image below is an example of which IBM App Connect Toolkit editor?
- A. Policy Editor
- B. Graphical Data Mapping
- C. Message Definition
- D. Message Flow Editor
正解: B
質問 14
How can an MQGet node be configured to read a message from a queue without deleting it?
- A. Set "Generate Mode" property to None
- B. Check the "Browse Only" property
- C. Set "Copy Message" property to None
- D. Check the "Read Only" property
正解: B
質問 15
What is a difference between using Convert Single Project and Convert Multiple Projects when converting from projects to applications and libraries?
- A. Convert Single Project is for one existing project and Convert Multiple Projects is for one or more existing projects.
- B. Convert Single Project will put all artifacts into one application or library, while Convert Multiple Projects will create a new application or library for each existing project.
- C. Only Convert Single Project can convert existing Message Broker projects into IBM App Connect Enterprise applications and libraries, Convert Multiple Projects requires the projects to meet IBM Integration Bus standards before converting.
- D. Convert Single Project is for converting an existing project and any references into one application while Convert Multiple Projects will convert into multiple desired applications with shared libraries.
正解: C
質問 16
What Event Coordination option must be implemented in the Collector node so that message collections are propagated in the order they have been completed?
- A. FIFO
- B. Disabled
- C. First complete collection
- D. All complete collections
正解: D
質問 17
On distributed systems, where must the local queue manager be specified in globally coordinated transactions?
- A. Message Flow
- B. MQ Header
- C. JMS Header
- D. Integration Node
正解: D
解説:
Explanation
https://www.ibm.com/support/knowledgecenter/en/SSMKHH_10.0.0/com.ibm.etools.mft.doc/ac04561_.htm
質問 18
What Event Coordination option must be implemented in the Collector node so that message collections are propagated in the order they have been completed?
- A. First complete collection
- B. FIFO
- C. All complete collections
- D. Disabled
正解: A
質問 19
When sharing data between a calling flow and a response flow, how can user context data be stored?
- A. By setting a value in the Environment.CallableFlow.UserContext environment variable
- B. On a database or in a local drive
- C. By setting a value in the ContextData environment variable or in a local drive
- D. In a remote database or in the local host's memory
正解: A
解説:
Explanation
https://www.ibm.com/support/knowledgecenter/SSMKHH_10.0.0/com.ibm.etools.mft.doc/cl28163_.html To store user context data, you can either set a value in the Environment.CallableFlow.UserContext environment variable, or create and populate child folders below it in the message tree. For example, you can use the following command to specify context data to be stored the environment:
SET Environment.CallableFlow.UserContext = 'myData';
質問 20
Once a BAR file is configured it can be deployed to which production environment?
- A. IBM API Connect
- B. IBM App Connect on IBM Cloud
- C. IBM App Connect Enterprise Developer Edition
- D. IBM App Connect Professional
正解: B
解説:
Explanation
https://www.ibm.com/support/knowledgecenter/SSMKHH_10.0.0/com.ibm.etools.mft.doc/af03860_.htm
質問 21
What is the purpose of an Integration Node?
- A. It is a parent process which is responsible for looking after one or more associated runtime processes.
- B. It provides a specific mode of operation or the availability of an additional product, such as a database.
- C. It provides an isolated runtime environment for a set of deployed message flows and resources.
- D. It is a collection of processes to manage state of the deployed applications and libraries.
正解: C
質問 22
Which file needs to exist in the directory where the command docker build run?
- A. config.yaml
- B. docker.yaml
- C. Configfile
- D. Dockerfile
正解: D
質問 23
How can static library LIB1 be converted into a shared library without breaking references?
- A. Highlight the static library, open convert wizard create a new shared library selecting the resolve references checkbox which will update all applications, libraries, and independent resources that referenced LIB1.
- B. Use the shared library conversion tool from the Integration Toolkit
- C. Create a new shared library named TMP1, move all assets from static library, rename the static library, and rename shared library LIB1.
- D. Export static library LIB1 as a shared library, import new shared library into the workspace replacing static library with new shared LIB1.
正解: D
質問 24
What are two nodes that require IBM MQ to be installed on the same machine as IBM App Connect Enterprise?
- A. Collector
- B. GroupGather
- C. FlowOrder
- D. Resequence
- E. Route
正解: A,D
解説:
Explanation
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/bb28660_.html
質問 25
Which two features of IBM App Connect Enterprise require IBM MQ to be installed?
- A. JMS messaging
- B. Managed application support
- C. Assimilation
- D. Timer nodes
- E. Collector nodes
正解: D,E
質問 26
How is an IBM supplied pattern removed from the IBM App Connect Enterprise Toolkit?
- A. Right-click the pattern name in Pattern Repositories > OT4I GitHub Pattern Repository and choose Purge.
- B. Right-click the pattern and choose Uninstall.
- C. Right-click the pattern and choose Purge.
- D. Right-click the pattern name in Pattern Repositories > OT4I GitHub Pattern Repository and choose Uninstall.
正解: D
解説:
Explanation
If you want to uninstall and remove a pattern from the IBM App Connect Enterprise Toolkit, right-click the pattern name in Pattern Repositories > OT4I GitHub Pattern Repository and click Uninstall.
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/ac68260_.html
質問 27
What are two purposes of a user trace?
- A. Detect Web-Admin login failures
- B. Debug message flows and integration servers
- C. Monitor user activity
- D. Provide more information than the administration log
- E. Provide flow usage metrics
正解: B,D
質問 28
Which IBM App Connect Enterprise component interacts with version control systems?
- A. IBM App Connect Enterprise Web User Interface
- B. IBM App Connect Enterprise toolkit
- C. Integration Node
- D. Integration Server
正解: B
質問 29
Which prerequisite task must be done before encrypting a connection to an MQTT server?
- A. Create a connection from the MQTT server to the SSL server.
- B. Configure the Security identity property on the MQTT server to use encrypted message flow.
- C. Create a truststore and import the MQTT server public certificate into the truststore.
- D. Configure the MQTT server to communicate using JMT encryption.
正解: C
質問 30
What are two methods for configuring a Highly Available IBM App Connect Enterprise installation?
- A. A Microsoft Cluster Server
- B. Multi-instance integration nodes with IBM MQ
- C. Network deployment mode
- D. High Availability mode
- E. Integration node clustering
正解: A,D
質問 31
What is the maximum number of integration servers that can be used in a single server running IBM App Connect Enterprise?
- A. Up to 256
- B. Up to 512
- C. Up to 128
- D. Unlimited
正解: D
解説:
Explanation
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/bn28100_.html
質問 32
Which two external security providers can be configured in the security profiles in IBM App Connect Enterprise?
- A. OAuth 2.0
- B. RADIUS
- C. WS-Trustv1.3STS
- D. Linux PAM
- E. LDAP
正解: A,E
質問 33
What is the best practice approach for storing shared development resources?
- A. Tables
- B. Libraries
- C. Message Map
- D. Files
正解: B
質問 34
What is the purpose of the mqsicreateworkdir command?
- A. It allows the creation of a new integration switch server work directory
- B. It allows the creation of a new integration node work directory
- C. It allows the creation of a new integration server work directory
- D. It allows the creation of a new integration flow work directory
正解: C
解説:
Explanation
PurposeYou use the mqsicreateworkdir command to create a new directory to be used as an integration server's work directory.
https://www.ibm.com/support/knowledgecenter/en/SSTTDS_11.0.0/com.ibm.etools.mft.doc/createworkdircmd_
質問 35
Where are recorded messages sent by default in the flow exerciser?
- A. They are sent to the input node where each message was saved
- B. They are sent to the output node where each message was saved
- C. They are sent to the Recorded Messages item located in the navigator
- D. They are sent to the Message Flow icon in the Flow Exerciser toolbar
正解: D
質問 36
What is the file format of resource statistics that are written by resource managers?
- A. JSON
- B. HTML
- C. CSV
- D. XML
正解: C
質問 37
......
C1000-056合格させる問題集でIBM24時間で試験合格できます:https://www.goshiken.com/IBM/C1000-056-mondaishu.html
最新問題を使おうC1000-056試験問題と解答PDFで一年間無料更新:https://drive.google.com/open?id=1V6i0nJtNhA_9W_yOj5TK1O9ozU4xxDaH