質問 # 19
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check Which settings can you change and still run a successful consistency check? Note: There are 2 correct answers to this question

  • A. Change the description of attribute in the time profile
  • B. Change the past and future horizon of the level in the time profile
  • C. Add a new time profile level to the time profile
  • D. Change the numbering hierarchy of the period IDS in the time profile.

正解:A、B


質問 # 20
As an architect, you are configuring the Planner Workspaces user interface settings. Which appearance settings are on your to-do list? Note: There are 3 correct answers to this question

  • A. Add playbooks for alerts
  • B. Add Navigation profile
  • C. Define key figure formatting
  • D. Add custom alerts
  • E. Adding planning view

正解:A、D、E


質問 # 21
You are working with inventory key figures. What are some of the business scenarios where you can use the Last Period Aggregation function? Note: There are 2 correct answers to this question

  • A. Calculating how many periods inventory is going to last based on the planned demand
  • B. Searching for and returning the last not-full value of the inventory key figure
  • C. Calculating the value of inventory on any level from the time profile, ensuring flexibility of calculation
  • D. Calculating the value of inventory on on weekly basis, using static argentation from the daily 'evel

正解:C、D


質問 # 22
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

  • A. Aggregated constraints
  • B. Minimum lot size
  • C. Transportation lead time
  • D. Adjusted transportation receipts
  • E. Maximum lot size

正解:B、C、D


質問 # 23
Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note:
There are 2 correct answers to this question.

  • A. Inventory Build and Reduction
  • B. Stock Replenishment
  • C. Order Prioritization
  • D. Balancing Supply and Demand

正解:A、D


質問 # 24
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.

  • A. Copying multiple key figures on different planning levels is not possible.
  • B. Necessary source key figures values are disaggregated.
  • C. Necessary target key figures value are disaggregated
  • D. Copying multiple key figures can be processed sequentially

正解:C、D


質問 # 25
Which functional capabilities are included in SAP IBP for response and supply? Note: There are 2 correct answers to this question

  • A. Detailed Production Scheduling
  • B. Analyse supply Usage
  • C. Gating Factor
  • D. Calculating buffer proposals

正解:B、C


質問 # 26
What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question.

  • A. Automated, exception- based processing
  • B. Determination of coefficient of variation (CV)
  • C. Embedded, on-the-fly demand analytics
  • D. Statistical analysis using the predictive analytics tools
  • E. Classifying demand into zones

正解:A、B、C


質問 # 27
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct answers to this question

  • A. Key figure can be calculated across the different planning levels
  • B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level.
  • C. The calculation chain for a key figure must always result in a calculated key figure
  • D. All key figure calculation have calcuation inputs, which can be marked as stored or calucated

正解:A、D


質問 # 28
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note: Thereare 2 correct answers to this question.

  • A. You can add (or delete) planning objects to a planning view after these filters are applied
  • B. You can only apply one value-based filter per planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view
  • D. These filters can be used together with attributes totals in the same planning view

正解:A、D


質問 # 29
What is an example of a commonly used time-independent key figure?

  • A. A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B. A currency conversion key figure, such as Exchange Rate
  • C. Any attribute as a key figure
  • D. A unit of measure key figure, such as UoM Conversion Factor

正解:C


質問 # 30
You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.

  • A. Changing the layout of the master data workbooks
  • B. Chaging the entries from the Name Manager
  • C. Changing the member names
  • D. SAP IBP ribbon extension

正解:A、D


質問 # 31
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question

  • A. Choose time-independent key figures as segmentation measures
  • B. Substitute missing values in case of sporadic demands.
  • C. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
  • D. Identify inventory items that quire closer attentions

正解:A、D


質問 # 32
Which of these conditions must be met to create a Local Member key figure? Note: There are 2 correct answers to this question

  • A. Activate Local Member recognition settings is selected
  • B. Use Excel Cell reference in the report editor option is selected
  • C. Users should have authorization for template administration.
  • D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel

正解:A、C


質問 # 33
Which sourcing methods are required to identify the product flow through the network? Note:
There are 3 correct answers to this question.

  • A. Unspecified Sourcing
  • B. Sorucing via Costs
  • C. Sourcing via Production
  • D. Customer sourcing Rule
  • E. Sourcing via Demand Prioritization

正解:B、C、D


質問 # 34
Which processes are running in sampl to this question.

  • A. Response Planning
  • B. Demand Sensing
  • C. Inventory Optimization
  • D. Sales and Operation planning
  • E. Supply and Allocation Planning

正解:B、C、D


質問 # 35
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be appliedto? Note: There are 2 correct answers to this question.

  • A. Planning view template in the SAP IBP, add-in for Microsoft Excel
  • B. Supply chain graph in Supply Chain Network app
  • C. Jobs in the Application jobs app
  • D. Compare function in the Planning Areas app

正解:A、C


質問 # 36
What are some of the actions configurators can do when working correct answers to this question

  • A. Run an application job to purge obsolete versions
  • B. Copy master data from base version to other version
  • C. Copy key figure data from any version to any version
  • D. Delete key figure data for a date range for all versions at once

正解:B、D


質問 # 37
You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question

  • A. Set up a three-tier landscape using transport, starting from the development system to test and - production
  • B. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system
  • C. Create additional test planning areas in the production system to support cutover needs
  • D. Create additional planning areas in the test system to support training needs.

正解:A、D


質問 # 38
What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.

  • A. Try to go as granular as possible with the customer product
  • B. Assign a high cost value (1 million or more ) for non-delivery to priority customers
  • C. Ensure discounting does not result in negative costs for each customer-product combination.
  • D. Ensure product prioritization with the combination of customer and product

正解:C、D


質問 # 39
You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question

  • A. Leveraging the web-based Planning capability
  • B. Using Driver-Based planning
  • C. Using Microsoft Excel planning views
  • D. Leveraging the functionality of SAP Work zone

正解:A、C


質問 # 40
Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question.

  • A. It checks whether the sourcing in the Production Source Item master data type exists.
  • B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network
  • C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network
  • D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network
  • E. It reports input key figure for which no related master data exists.

正解:A、B、D