100%無料C_IBP_2311試験問題集リアルSAP Certified Application Associate問題集80解答を掴み取れ!
あなたを余裕でC_IBP_2311試験合格させます!100%試験高合格率保証 [2024]
質問 # 19
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check Which settings can you change and still run a successful consistency check? Note: There are 2 correct answers to this question
- A. Change the description of attribute in the time profile
- B. Change the past and future horizon of the level in the time profile
- C. Add a new time profile level to the time profile
- D. Change the numbering hierarchy of the period IDS in the time profile.
正解:A、B
質問 # 20
As an architect, you are configuring the Planner Workspaces user interface settings. Which appearance settings are on your to-do list? Note: There are 3 correct answers to this question
- A. Add playbooks for alerts
- B. Add Navigation profile
- C. Define key figure formatting
- D. Add custom alerts
- E. Adding planning view
正解:A、D、E
質問 # 21
You are working with inventory key figures. What are some of the business scenarios where you can use the Last Period Aggregation function? Note: There are 2 correct answers to this question
- A. Calculating how many periods inventory is going to last based on the planned demand
- B. Searching for and returning the last not-full value of the inventory key figure
- C. Calculating the value of inventory on any level from the time profile, ensuring flexibility of calculation
- D. Calculating the value of inventory on on weekly basis, using static argentation from the daily 'evel
正解:C、D
質問 # 22
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question
- A. Aggregated constraints
- B. Minimum lot size
- C. Transportation lead time
- D. Adjusted transportation receipts
- E. Maximum lot size
正解:B、C、D
質問 # 23
Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note:
There are 2 correct answers to this question.
- A. Inventory Build and Reduction
- B. Stock Replenishment
- C. Order Prioritization
- D. Balancing Supply and Demand
正解:A、D
質問 # 24
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.
- A. Copying multiple key figures on different planning levels is not possible.
- B. Necessary source key figures values are disaggregated.
- C. Necessary target key figures value are disaggregated
- D. Copying multiple key figures can be processed sequentially
正解:C、D
質問 # 25
Which functional capabilities are included in SAP IBP for response and supply? Note: There are 2 correct answers to this question
- A. Detailed Production Scheduling
- B. Analyse supply Usage
- C. Gating Factor
- D. Calculating buffer proposals
正解:B、C
質問 # 26
What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question.
- A. Automated, exception- based processing
- B. Determination of coefficient of variation (CV)
- C. Embedded, on-the-fly demand analytics
- D. Statistical analysis using the predictive analytics tools
- E. Classifying demand into zones
正解:A、B、C
質問 # 27
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct answers to this question
- A. Key figure can be calculated across the different planning levels
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level.
- C. The calculation chain for a key figure must always result in a calculated key figure
- D. All key figure calculation have calcuation inputs, which can be marked as stored or calucated
正解:A、D
質問 # 28
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note: Thereare 2 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied
- B. You can only apply one value-based filter per planning view.
- C. The alerts dashboard is not available if a value-based filter is set for the open planning view
- D. These filters can be used together with attributes totals in the same planning view
正解:A、D
質問 # 29
What is an example of a commonly used time-independent key figure?
- A. A Special key figure marked as an aggregate key figure (aggregate constraint)
- B. A currency conversion key figure, such as Exchange Rate
- C. Any attribute as a key figure
- D. A unit of measure key figure, such as UoM Conversion Factor
正解:C
質問 # 30
You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.
- A. Changing the layout of the master data workbooks
- B. Chaging the entries from the Name Manager
- C. Changing the member names
- D. SAP IBP ribbon extension
正解:A、D
質問 # 31
What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question
- A. Choose time-independent key figures as segmentation measures
- B. Substitute missing values in case of sporadic demands.
- C. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B"
- D. Identify inventory items that quire closer attentions
正解:A、D
質問 # 32
Which of these conditions must be met to create a Local Member key figure? Note: There are 2 correct answers to this question
- A. Activate Local Member recognition settings is selected
- B. Use Excel Cell reference in the report editor option is selected
- C. Users should have authorization for template administration.
- D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel
正解:A、C
質問 # 33
Which sourcing methods are required to identify the product flow through the network? Note:
There are 3 correct answers to this question.
- A. Unspecified Sourcing
- B. Sorucing via Costs
- C. Sourcing via Production
- D. Customer sourcing Rule
- E. Sourcing via Demand Prioritization
正解:B、C、D
質問 # 34
Which processes are running in sampl to this question.
- A. Response Planning
- B. Demand Sensing
- C. Inventory Optimization
- D. Sales and Operation planning
- E. Supply and Allocation Planning
正解:B、C、D
質問 # 35
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be appliedto? Note: There are 2 correct answers to this question.
- A. Planning view template in the SAP IBP, add-in for Microsoft Excel
- B. Supply chain graph in Supply Chain Network app
- C. Jobs in the Application jobs app
- D. Compare function in the Planning Areas app
正解:A、C
質問 # 36
What are some of the actions configurators can do when working correct answers to this question
- A. Run an application job to purge obsolete versions
- B. Copy master data from base version to other version
- C. Copy key figure data from any version to any version
- D. Delete key figure data for a date range for all versions at once
正解:B、D
質問 # 37
You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question
- A. Set up a three-tier landscape using transport, starting from the development system to test and - production
- B. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system
- C. Create additional test planning areas in the production system to support cutover needs
- D. Create additional planning areas in the test system to support training needs.
正解:A、D
質問 # 38
What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question.
- A. Try to go as granular as possible with the customer product
- B. Assign a high cost value (1 million or more ) for non-delivery to priority customers
- C. Ensure discounting does not result in negative costs for each customer-product combination.
- D. Ensure product prioritization with the combination of customer and product
正解:C、D
質問 # 39
You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question
- A. Leveraging the web-based Planning capability
- B. Using Driver-Based planning
- C. Using Microsoft Excel planning views
- D. Leveraging the functionality of SAP Work zone
正解:A、C
質問 # 40
Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question.
- A. It checks whether the sourcing in the Production Source Item master data type exists.
- B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network
- C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network
- E. It reports input key figure for which no related master data exists.
正解:A、B、D
質問 # 41
......
学習材料は有効C_IBP_2311効率的問題集:https://www.goshiken.com/SAP/C_IBP_2311-mondaishu.html
C_IBP_2311問題集本日限定!無料アクセス可能に!:https://drive.google.com/open?id=1iyIMjAM_JEmcZbX8gRAaHbgL4rrFzcj-