質問 14
When can filter blocks appear in calculations? Note: There are 2 correct Answers to this question.

  • A. When modeling cross-period calculations
  • B. When modeling attribute transformations
  • C. When using IFISNULL statements in the formula
  • D. When modeling attribute as a key figure

正解: A,B

 

質問 15
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. If necessary target key figures values are disaggregated.
  • B. Copying multiple key figures can be processed sequentially.
  • C. If necessary source key figures values are disaggregated.
  • D. Copying multiple key figures on different planning levels is not possible.

正解: B,C

 

質問 16
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.

  • A. Number of local members and complexity of calculations
  • B. Complex calculation graphs for key figures
  • C. Number of analytics charts displaying key figures' values
  • D. Excessive SAP IBP formatting in the Microsoft Excel UI

正解: B,D

 

質問 17
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.

  • A. Enter the product family to which the new product belongs
  • B. Create planning objects for new combinations in the app
  • C. Copy the launch dimension from the reference product to the new product
  • D. Enter the Phase-out Start Date and Phase-out End Date

正解: B,C

 

質問 18
Which supply chain challenge is addressed by SAP IBP for demand?

  • A. Inability to arrive at consensus demand
  • B. Inability to respond to short-term changes in supply and demand
  • C. Inability to synchronize supply and demand
  • D. Inability to understand and shape actual demand

正解: D

 

質問 19
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.

  • A. Scenario analysis for operational supply planning
  • B. Multi-Level Supply Planning Heuristics
  • C. Time series analysis
  • D. Simple statistical forecast

正解: B,D

 

質問 20
You are working with the inventory optimization process and you want to use a what-if analysis. What parameters are assessed by this analysis? Note: There are 2 correct Answers to this question.

  • A. Capacity consumption
  • B. Changed variability
  • C. Number of planning combinations
  • D. Service levels

正解: B,D

 

質問 21
You are creating advanced copy operators as part of an SAP IBP solution that is being implemented.
What do you need to be aware of when defining data transfer? Note: There are 2 correct Answers to this question.

  • A. Specifying target key figure that is time independent is possible.
  • B. Specifying target key figure is mandatory.
  • C. Selecting by attribute with option 'contain' is possible.
  • D. Specifying source key figure is mandatory.

正解: B,D

 

質問 22
What are some of the available ABC segmentation methods in IBP? Note: There are 2 correct Answers to this question.

  • A. By Number of Items (Sorted Average)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Pareto Principle (Sorted and Calculated Values)
  • D. By Number of Items (Sorted Values)

正解: C,D

 

質問 23
You define fixing for a key figure.Which of the following functions are available for this key figure? Note:
There are 2 correct answers to this question.

  • A. Fixing is possible for manually editable key figures.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain quantity of a key figure value.
  • D. Fixing is possible for a certain period, including all child values in the hierarchy.

正解: B,D

 

質問 24
Which of the following configuration options are part of the new key figure creation process? Note:
There are 3 correct Answers to this question.

  • A. Enabling planning notes for the key figure
  • B. Setting disaggregation logic for the key figure
  • C. Enabling fixing for the key figure
  • D. Setting permitted planning levels
  • E. Hiding or displaying totals for the key figure

正解: A,B,C

 

質問 25
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.

  • A. Used when you have more than three inputs at different planning levels in one calculation
  • B. Used at any level of calculation level except the Request Level
  • C. Used by end-users in planning views to help visualize cross-period calculations
  • D. Used to break down a large calculation into manageable subcalculations

正解: A,D

 

質問 26
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.

  • A. New instances of templates allow for re-use of the same processes.
  • B. Each step depicted in the template can have tasks associated with it.
  • C. The S&OP process step can be started with an application job.
  • D. All process templates are assigned to dashboards.

正解: A,B

 

質問 27
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.

  • A. Capacity leveling will be possible for production and storage resources.
  • B. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
  • C. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • D. Enough demands can be pulled forward and pull production will occur.

正解: B,D

 

質問 28
Which of the following modes can you use when creating a constrained plan? Note: There are 2 correct Answers to this question.

  • A. Resource maximization
  • B. Profit maximization
  • C. Production maximization
  • D. Delivery maximization

正解: B,D

 

質問 29
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note:
There are 2 correct answers to this question.

  • A. Change the numbering hierarchy of the period IDs in the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Add a new time profile level to the time profile.

正解: B,C

 

質問 30
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.

  • A. Search for and return the last not null value of the inventory key figure
  • B. Calculating how many periods inventory is going to last based on the planned demand
  • C. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
  • D. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level

正解: A,B

 

質問 31
What setting is mandatory in the Manage Lifecycle Planning app when introducing a new product?

  • A. Define which is the attribute ID for the Lifecycle profiles
  • B. Define at least one attribute of the planning area which represents the Product ID
  • C. Define which phase-in and phase-out profiles can be used within Lifecycle Planning
  • D. Define which key figure can be used as sales history for new products

正解: D

 

質問 32
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results? Note: There are 2 correct Answers to this question.

  • A. It should be a non-key attribute of the master data type.
  • B. Its data type is INTEGER and its length has been specified.
  • C. It belongs to a simple or compound master data type.
  • D. The length of the attribute needs to be 18 digits.

正解: A,C

 

質問 33
Forecast Error CV is an input to which of the following?

  • A. Forecast Error Calculation in Inventory Planning Profile Operator
  • B. Calculate Target Inventory Components in Inventory Planning Profile Operator
  • C. Multistage Inventory Optimization in Inventory Planning Profile Operator
  • D. Time-Series-Based Supply Planning Optimizer

正解: C

 

質問 34
You have set up infinite S&OP heuristics for unconstrained planning. What must you do to model inputs as constraints? Note: There are 2 correct Answers to this question.

  • A. Enter transportation lead times.
  • B. Model adjusted transport receipts.
  • C. Set minimum and maximum lot sizes.
  • D. Create product substitutions.

正解: A,B

 

質問 35
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.

  • A. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • B. Both periods and profiles have start and end dates.
  • C. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • D. Both periods and profiles are identified by a unique integer.

正解: A,C

 

質問 36
Which of the following stages can be modeled using scenarios from the S&OP planning cycle? Note:
There are 2 correct Answers to this question.

  • A. Data input review for inventory
  • B. Demand review
  • C. Demand sensing stage
  • D. Demand-supply balancing

正解: B,D

 

質問 37
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.

  • A. Adjust Safety Stock Recommendations based on forecast error CV input
  • B. Adjust for forecast bias in Forecast Error CV calculations
  • C. Identifiy intermittent demand for Forecast Error CV calculations
  • D. Propagate forecast error to upstream locations in a supply chain network

正解: A,B

 