[2022年01月]更新のC-PO-7517試験問題集、無料サンプル365日更新 [Q71-Q90]

Share

[2022年01月]更新のC-PO-7517試験問題集、無料サンプル365日更新

まもなく無料セール終了!リアルC-PO-7517のPDF解答使おう

質問 71
In which of the following applications can business rules be created?
Choose the correct answers.

  • A. Process Composer
  • B. Visual Composer
  • C. Web Dynpro
  • D. Rules Composer

正解: A,D

 

質問 72
You create an asynchronous scenario. The message sequence must remain identical. Which Quality of Service must you use?

  • A. Best Effort (BE)
  • B. Exactly Once (EO)
  • C. Exactly Once in Order (EOIO)
  • D. qRFC

正解: B

 

質問 73
The sender ... adapter can read files and send them to SAP Process Integration (PI) message processing.
Choose the correct answer.

  • A. HTTP
  • B. ABAP
  • C. File/FTP

正解: C

 

質問 74
Each time data is transferred between two systems, identify the ... interface and the ... interface.
Choose the correct answer

  • A. Receiver outbound, sender inbound
  • B. Sender outbound, receiver inbound
  • C. Receiver outbound, sender outbound
  • D. Receiver inbound, sender inbound

正解: B

 

質問 75
The ... is a cost-saving option compared to a full installation of SAP Process Integration (PI).
Choose the correct answer.

  • A. Enterprise Service Repository (ESR)
  • B. Advanced Adapter Engine Extended (AEX)
  • C. Advanced Adapter Engine (AAE)
  • D. System Landscape Directory (SLD)

正解: B

 

質問 76
Which object do you import from the SLD before you start creating design objects in the ESR?

  • A. Product instance
  • B. Software component version
  • C. Business system
  • D. Software catalog

正解: B

 

質問 77
The COMMIT WORK statement is required in another function module to write data in the database.
Determine whether this statement is true or false.

  • A. True
  • B. False

正解: A

 

質問 78
The Java component SLD data supplier is deployed and started for the SAP NetWeaver AS Java server.
Determine whether this statement is true or false.

  • A. True
  • B. False

正解: A

 

質問 79
Which of the following elements is the base of the process controlled processes Choose the correct answer.

  • A. Methods used for defining an organization's workflows
  • B. Non-technically oriented applications supporting end-to-end business processes
  • C. Reuse of existing technical capabilities
  • D. Reuse of interfaces associated with the process

正解: C

 

質問 80
Which of the following logs contains information about BPM processes and tasks?
Choose the correct answer.

  • A. Business log
  • B. Process log
  • C. J2EE Engine log
  • D. Connection log

正解: A

 

質問 81
Which multi-mapping option can you use to combine multiple messages into one message?
Choose the correct answers.

  • A. 1:n
  • B. n:1
  • C. n:m

正解: B

 

質問 82
Which of these functions appends the ResultList.CC constant?
Choose the correct answer.

  • A. addValue
  • B. addSuppress
  • C. addContextChange
  • D. clear

正解: C

 

質問 83
SAP's Core Data Types (CDTs) are modeled on which standard?

  • A. GS1
  • B. CCTS
  • C. cXML
  • D. DSML

正解: B

 

質問 84
Which methods can you use in SAP BRM to model complex rules? Note: There are 3 correct answers to this question.

  • A. Gateways
  • B. Routing rules
  • C. Rule scripts
  • D. Decision tables
  • E. Access management

正解: A,C,D

 

質問 85
A message type can be used for both ... and ... service interfaces.
Choose the correct answer.

  • A. outbound, external outbound mapping
  • B. outbound, inbound
  • C. aggregated, total

正解: B

 

質問 86
Which tab page contains the SET FLAT File conversion option?
Choose the correct answer.

  • A. RFC Parameters
  • B. Module
  • C. Advanced
  • D. Optional Parameters

正解: B

 

質問 87
Which of the following tools are used for creating the configuration view for the integrated configuration?
Choose the correct answers.

  • A. Advanced Adapter Engine Extended (AEX)
  • B. System Landscape Directory (SLD)
  • C. Non-central AAE
  • D. Central Advanced Adapter Engine (AAE)

正解: A,C,D

 

質問 88
What are the three Business Process Management components
Choose the correct answers.

  • A. Process Desk
  • B. Process Composer
  • C. Process Context
  • D. Process Server

正解: B,C,D

 

質問 89
Arrange the process for defining a global user-defined function in the correct sequence. (1) Define user- defined functions in the function library. (2) Create a function library. (3) Use (global) user-defined functions from the function library in the message mapping. (4) Include the function library in the message mapping.
Choose the correct answer.

  • A. (3),(4),(2),(1)
  • B. (2),(1),(4),(3)
  • C. (1),(4),(3),(2)
  • D. (4),(l),(3),(2)

正解: B

 

質問 90
......

C-PO-7517問題集あなたを合格させる認証試験:https://www.goshiken.com/SAP/C-PO-7517-mondaishu.html