[2022年01月26日]C-TPLM30-67練習試験問題集で試験99%合格率があります
最新の検証済みC-TPLM30-67問題と解答、合格保証もしくは全額返金
質問 28
When you create a refurbishment order, which reference objects can you use?
There are 3 correct answers to this question.
Response:
- A. Material with serial number
- B. Equipment with serial number
- C. Equipment without serial number
- D. Functional location
- E. Material without serial number
正解: A,B,E
質問 29
How much memory is required if a customer plans to use the Dell Storage Replication Adapter for VMware with their Dell EMC Data Collector?
- A. 8 GB
- B. 12 GB
- C. 4 GB
- D. 10 GB
正解: C
質問 30
Which of the following control characters is available in the edit mask of the structure indicator?
Please choose the correct answer.
Response:
- A. M (alphanumeric characters)
- B. A (alpha characters)
- C. Y (special characters)
- D. D (numeric characters)
正解: B
質問 31
The maintenance of a technical system comprises the following tasks:
Please choose the correct answer.
Response:
- A. Closed system
- B. Inspection
- C. Construction
- D. Project assistance
- E. Evaluation
正解: B
質問 32
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?
Please choose the correct answer.
Response:
- A. Controlling area
- B. Production cost center
- C. Work center
- D. Plant section
正解: D
質問 33
What does the maintenance plan category determine?
- A. The type of technical object for the maintenance plan
- B. The grouping of similar maintenance plans together for reporting
- C. How maintenance call objects are generated for a due maintenance call
- D. The type of maintenance call object the system generates for a due maintenance call
正解: D
質問 34
You have selected Confirmation Required in the control key for operations in a maintenance order.
One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed?
There are 3 correct answers to this question.
Response:
- A. TECO
- B. CRTD
- C. CLSD
- D. PCNF
- E. CNF
正解: A,C,D
質問 35
What are the 2 reasons of the maintenance Bill of Material
There are 2 correct answers to this question.
Response:
- A. Distribution
- B. Planning in task list
- C. Object identification
- D. Structuring of the object
- E. Clearance
正解: B,D
質問 36
How are the planned costs for the refurbished part or parts displayed in the planned/actual order report?
- A. As costs with a negative value
- B. As costs with a positive value
- C. As revenue with a negative value
- D. As revenue with a positive value
正解: A
質問 37
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Maintenance plant
- B. Planning plant
- C. Work center
- D. Storage location
正解: B
質問 38
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
- A. Select a maintenance planner group and set the Do Not Release Immediately indicator.
- B. Set the Do Not Release Immediately indicator in the task list header.
- C. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
- D. Select a maintenance activity type and set the Do Not Release Immediately indicator.
正解: C
質問 39
To which objects can you assign a user status profile? (Choose three)
- A. A maintenance plan category
- B. An equipment category
- C. An order type
- D. A notification type
- E. A task list type
正解: B,C,D
質問 40
What purpose does the maintenance planner group serve?
- A. It determines which maintenance call object the system generates for a due maintenance call.
- B. It identifies a person who is part of the main work center and who acts as the supervisor.
- C. It represents a person or a group of persons who is responsible for maintaining task lists.
- D. It identifies a person or a group of persons who is responsible for planning maintenance activities for a number of technical objects.
正解: D
質問 41
Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.
In Customizing, how can you accomplish this requirement? (Choose two)
- A. By activating the operation selection indicator
- B. By setting the indicators for the order type only
- C. By setting the indicators for the planning plant only
- D. By activating the work center selection indicator
正解: A,D
質問 42
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
- A. Define a valuation code group.
- B. Create the measuring point as a counter.
- C. Activate the Measurement Reading Transfer indicator.
- D. Specify the annual estimated usage for the measuring point.
正解: B,D
質問 43
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?
- A. Priority
- B. Maintenance planner group
- C. Maintenance activity type
- D. Main work center
正解: B
質問 44
What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choose two)
- A. The operation must have a control key with the Determine Capacity Requirements indicator set.
- B. The numeric value for Work in the order operation must be greater than 0.
- C. The performing work center must have a control key with the Determine Capacity Requirements indicator set.
- D. The performing work center must have available capacity data.
正解: A,B
質問 45
Which rule applies to user status in orders and notifications?
Please choose the correct answer.
Response:
- A. When you set a new user status with a status number, the previous user status with status number is deactivated.
- B. The user status in the notification can be copied into the order.
- C. Every user, regardless of assigned authorizations, can assign a user status.
- D. When a user status is flagged as an initial status, it overrides the initial system status CRTD.
正解: A
質問 46
Your customer has several plants.
How do you set up the maintenance organizational structure to implement centralized maintenance planning?
- A. Assign all your work centers to one of your maintenance plants.
- B. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
- C. Define a plant and assign it to a company code.
- D. Assign all your work centers to one of your central planning plants.
正解: B
質問 47
For what maintenance manager is responsible.
Please choose the correct answer.
Response:
- A. Execute the planning process
- B. None of the above
- C. Multiple tasks
- D. Defining, controlling and triggering the budget planning process
正解: D
質問 48
In an SC8000 environment, what is a reason why Legacy Port Mode should be implemented on the front-end legacy Mode?
- A. Simplify iSCSI connectivity
- B. Support AIX servers without NPIV
- C. Improve front-end redundancy
- D. Increase front-end performance
正解: D
解説:
Explanation/Reference:
Reference https://www.dell.com/storagehelp/dellstorageclient/2016R3/en-us/GUID-2D6A2482-F78D-4598- ADA3-D9E49ED3ED7F.html
質問 49
Refer to the Exhibit.

A customer needs your assistance in recovering files that were deleted from an SC Series array volume. The files were deleted around 1:00 AM on January 7th. Based on the exhibit of the Dell Storage Manager (DSM), which recommendation allows the customer to recover the most recent deleted files?
- A. Select "Create Volume from Snapshot" taken on January 7 and map to a server
- B. Select "Create Volume from Snapshot" taken on January 6 and map to a server
- C. Take a manual snapshot and then select "Create Volume from Snapshot"
- D. Recover from backup, deleted files are unrecoverable from the storage array
正解: B
質問 50
Which of the following steps must you perform to customize priorities for a maintenance order?
- A. Assign a priority type to an order type.
- B. Assign priorities to order types.
- C. Assign a priority type to a technical object master record.
- D. Assign priorities to technical object master records.
正解: A
質問 51
......
C-TPLM30-67リアル有効かつ正確な問題集97問題と解答が待ってます:https://www.goshiken.com/SAP/C-TPLM30-67-mondaishu.html