[2022年04月]更新のAZ-120問題集本日限定!無料アクセス可能に!GoShikenで試そう [Q51-Q68]

Share

[2022年04月]更新のAZ-120問題集本日限定!無料アクセス可能に!GoShikenで試そう

学習材料は有効AZ-120効率的問題集!

質問 51
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation
Box 1: No
To log in to a Linux VM with Azure AD credentials, install the Azure Active Directory login VM extension.
Note: Azure AD Connect is the Microsoft tool designed to meet and accomplish your hybrid identity goals.
Box 2: NO
Box 3: No
References:
https://docs.microsoft.com/en-us/azure/virtual-machines/workloads/sap/deployment-guide

 

質問 52
HOTSPOT
You are integrating SAP HANA and Azure Active Directory (Azure AD).
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Hot Area:

正解:

解説:

Explanation:
Box 1: Yes
To configure Azure AD single sign-on with SAP HANA, perform the following steps:
1. In the Azure portal, on the SAP HANA application integration page, select Single sign-on.
2. On the Select a Single sign-on method dialog, select SAML/WS-Fed mode to enable single sign-on.

Box 2: No
Box 3: No
Key security considerations for deploying SAP on Azure
Reference:
https://docs.microsoft.com/en-us/azure/active-directory/saas-apps/saphana-tutorial

 

質問 53
You have an SAP environment that contains the following components:
* Enhancement Package 6 for SAP ERP Central Component 6.0 (SAP ECC 6.0)
* Servers that runs SUSE Linux Enterprise Server 12 (SIES 12)
* Databases on IBM D82 10.5
* SAP Solution Manager 7.1
You plan to migrate the SAP environment to Azure.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 54
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You have a complex SAP environment that has both ABAP- and Java-based systems. The current on-premises landscapes are based on SAP NetWeaver 7.0 (Unicode and Non-Unicode) running on Windows Server and Microsoft SQL Server.
You need to migrate the SAP environment to a HANA-certified Azure environment.
Solution: You upgrade to SAP NetWeaver 7.4, and then you migrate SAP to Azure by using Azure Site Recovery.
Does this meet the goal?

  • A. Yes
  • B. No

正解: A

解説:
We need upgrade to SAP NetWeaver 7.4 before the migration. Then Azure Site Recovery is used for the migration to Azure.
Reference:
https://docs.microsoft.com/en-us/azure/site-recovery/vmware-azure-architecture

 

質問 55
You plan to migrate an on-premises SAP development system to Azure.
Before the migration, you need to check the usage of the source system hardware, such as CPU, memory, network, etc.
Which transaction should you run from SAP GUI?

  • A. OS07N
  • B. SM51
  • C. DB12
  • D. DB01

正解: A

解説:
SAP transaction OS07N (Remote Operating System Activity) is classified in the Basis Component module under application component Operating System Monitors and runs Monitoring Operating System program RSHOST1N upon execution.
Incorrect Answers:
A: Transaction code SM51 is to display list of active application servers that have registered in the SAP message server.
B: DB01 is a transaction code used for Analyze Exclusive Lockwaits in SAP.
C: Transaction code DB12 is to collects and presents information that is necessary to monitor database backups.
Reference:
http://www.saptransactions.com/codes/OS07N/

 

質問 56
for each of the following statements, select Yes if the statement is true. Otherwise. select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 57
Your on-premises network contains an Active Directory domain.
You have an SAP environment on Azure that runs on SUSE Linux Enterprise Server (SLES) servers.
You configure the SLES servers to use domain controllers as their NTP servers and their DNS servers.
You need to join the SLES servers to the Active Directory domain.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

Explanation:
Step 1: Install the samba-winbind package
Install samba-winbind
Step 2: Add realm details to /etc/krb5.conf and /etc/samba/smb.conf
Edit files - best way to do this is to use yast on test machine and copy files from it In following examples you need to replace EXAMPLE/EXAMPLE.COM/.example.com with your values/settings
/etc/samba/smb.conf
[global]
workgroup = EXAMPLE
usershare allow guests = NO #disallow guests from sharing
idmap gid = 10000-20000
idmap uid = 10000-20000
kerberos method = secrets and keytab
realm = EXAMPLE.COM
security = ADS
template homedir = /home/%D/%U
template shell = /bin/bash
winbind offline logon = yes
winbind refresh tickets = yes
/etc/krb5.conf
[libdefaults]
default_realm = EXAMPLE.COM
clockskew = 300
[realms]
EXAMPLE.COM = {
kdc = PDC.EXAMPLE.COM
default_domain = EXAMPLE.COM
admin_server = PDC.EXAMPLE.COM
}
..
Step 3: Run net ads join -U administrator
Join the SLES 12 Server to the AD domain
References:
https://www.suse.com/support/kb/doc/?id=7018461

 

質問 58
You have an on-premises third-party enterprise resource planning (ERP) system that uses Microsoft SQL Server 2016. You plan to migrate the ERP system to SAP Business Suite on SAP HANA on Azure virtual machines. You need to identify the appropriate sizing for Business Suite on HANA.
What should you use?

  • A. SAP Quick Sizer for HANA
  • B. HANA Cockpit
  • C. SAP Cloud Platform Cockpit
  • D. SAP Quick Sizer for HANA Cloud

正解: D

解説:
If a customer runs non-SAP systems, the only way of Sizing the required Hardware for SAP HANA is the Quick-Sizer tool.
HANA-based Cloud Quick Sizer: Please use this version, if the product that you want to size shall run in the Cloud; e.g. SAP S/4HANA Cloud and SAP Data Warehouse Cloud.
Reference:
https://www.sap.com/about/benchmark/sizing.html#quick-sizer

 

質問 59
You are planning replication of the SAP HANA database for the disaster recovery environment in Azure.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation:
Box 1: No
SAP HANA Replication consists of one primary node and at least one secondary node. Changes to the data on the primary node are replicated to the secondary node synchronously or asynchronously.
Box 2: No
Since SPS11 SAP HANA system replication can be run in two different operation modes:
delta_datashipping
logreplay
Box 3: Yes
Reference:
https://docs.microsoft.com/en-us/azure/virtual-machines/workloads/sap/sap-hana-high-availability-rhel
https://blogs.sap.com/2018/01/08/your-sap-on-azure-part-4-high-availability-for-sap-hana-using-system-replication/

 

質問 60
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation:
Box 1: Yes
By moving much of Azure's software-defined networking stack off the CPUs and into FPGA-based SmartNICs, compute cycles are reclaimed by end user applications, putting less load on the VM, decreasing jitter and inconsistency in latency.
Box 2: Yes
Box 3: No
Accelerated Networking (AN) is generally available (GA) and widely available for Windows and the latest distributions of Linux References:
https://azure.microsoft.com/en-us/blog/maximize-your-vm-s-performance-with-accelerated-networking-now-generally-available-for-both-windows-and-linux/

 

質問 61
You have an SAP environment that contains the following components:
* Enhancement Package 6 for SAP ERP Central Component 6.0 (SAP ECC 6.0)
* Servers that runs SUSE Linux Enterprise Server 12 (SIES 12)
* Databases on IBM D82 10.5
* SAP Solution Manager 7.1
You plan to migrate the SAP environment to Azure.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation

Box 1: Yes
Box 2: Yes
Box 3: No
With Microsoft Azure, you can migrate your existing SAP application running on IBM Db2 for Linux, UNIX, and Windows (LUW) to Azure virtual machines. With SAP on IBM Db2 for LUW, administrators and developers can still use the same development and administration tools, which are available on-premises.
Reference:
https://docs.microsoft.com/en-us/azure/data-factory/connector-sap-table
https://docs.microsoft.com/en-us/azure/virtual-machines/workloads/sap/dbms_guide_ibm

 

質問 62
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation:
Box 1: Yes
By moving much of Azure's software-defined networking stack off the CPUs and into FPGA-based SmartNICs, compute cycles are reclaimed by end user applications, putting less load on the VM, decreasing jitter and inconsistency in latency.
Box 2: Yes
Box 3: No
Accelerated Networking (AN) is generally available (GA) and widely available for Windows and the latest distributions of Linux References:
https://azure.microsoft.com/en-us/blog/maximize-your-vm-s-performance-with-accelerated-networking-now-generally-available-for-both-windows-and-linux/

 

質問 63
For each of the following statements, select yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 64
You have an Azure alert rule and action group as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 65
You need to connect SAP HANA on Azure (Large Instances) to an Azure Log Analytics workspace.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

1 - Configure a Log Analytics gateway on the virtual network that has connectivity to the SAP HANA on Azure (Larg Instanses )instance.
2 - Configure a Log Analytics gateway server as a proxy for the Log Analytics client on SAP HANA on Azure (Larg Instances).
3 - On the gateway, run Import-Module OMSGateway and Add- OMSGatewayAllowedHost.
4 - Install the Log Analytics client on the SAP HANA on Azure (Larg Instances) instance.
Reference:
http://www.deployazure.com/compute/virtual-machines/sap-azure-enhanced-monitoring-extension/
https://docs.microsoft.com/en-us/azure/azure-monitor/platform/gateway

 

質問 66
You have an SAP production landscape on Azure that contains the virtual machines shown in the following table.

You configure HANA system replication as shown in the following table.

You configure two load balancers as shown in the following table.

For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

Reference:
https://help.sap.com/viewer/6b94445c94ae495c83a19646e7c3fd56/2.0.02/en-US/f730f308fede4040bcb5ccea6751e74d.html
https://docs.microsoft.com/en-us/azure/virtual-machines/workloads/sap/sap-hana-high-availability
Topic 2, Litware, inc
Existing Environment
Infrastructure
Litware currently uses a third-party provider to host a datacenter in Miami and a disaster recovery datacenter in Chicago, it.
The network contains an Active Directory domain named litware.com.Litware has two third-party applications hosted in Azure.
Litware already implemented a site-to-site VPN connection between the on-premises network and Azure.
SAP Environment
Litware currently runs the following SAP products:
* Enhancement Pack 6 for SAP ERP Central Component 6.0 (SAP ECC 6.0)
* SAP Extended Warehouse Management (SAP EWM)
* SAP Business Warehouse (SAP BW)
* SAP NetWeaver Process Integration (PI)
* SAP Solution Manager
All users run on the Windows Server platform. All databases use Microsoft SQL Server. Currently, you have 20 production servers.
You have 30 non-production servers including five testing severs, five development servers, five quality assurance (QA) servers, and 15 pre=production servers.
Currently, all SAP applications are in the litware.com domain.
Problem Statements
The current version of SAP ECC has a transaction that, when run in batches overnight, tables eight hours to complete. You confirm that upgrading to SAP Business Suite on HANA will improve performance because of code changes and the SAP HANA database platform.
Litware is dissatisfied with the performance of its current hosted infrastructure vendor. Litware experienced several hardware failures and the vendor struggled to adequately its 24/7 business operation.
Business Goals
Litware identifies the following business goals:
* Increase the performance of SAP ECC application by moving to SAP HANA. All other database will remain on SQL Server.
* Move away from the current infrastructure vendor to increase the stability and availability of the Title SAP services.
* Use the new Environment, Health and Safety (EH&S) in Recipe Management function.
* Ensure that any migration activities can be completed within a 48-hour period during a weekend.
Planned Changes
Litware identifies the following planned changes:
* Migrate SAP to Azure.
* Upgrade and migrate SAP ECC to SAP business Suite on HANA Enhancement Pack 8.
Technical Requirements
Litware identifies the following technical requirements:
* Implement automated backups.
* Support load testing during the migrate.
* Identify opportunities to reduces costs during the migration.
* Continue to use the Litware.com domain for all SAP landscapes.
* Ensure that all SAP applications and databases are highly available.
* Remove all SAP components from the on-premises network once the migrate is complete.
* Minimize the purchase of additional SAP licenses. SAP HANA license were already purchased.
* Ensure that SAP can provide technical support for all the SAP landscapes deployed to Azure.

 

質問 67
You are evaluating which migration method Litware can implement based on the current environment and the business goals.
Which migration method will cause the least amount of downtime?

  • A. Migrate SAP to Azure, and then migrate SAP ECC to SAP Business Suite on HANA.
  • B. Migrate SAP ECC to SAP Business Suite in HANA, and then migrate SAP to Azure.
  • C. Use the Database Migration Option (DMO) to migrate to SAP HANA and Azure during the same maintenance window.
  • D. Use Near-Zero Downtime (NZDT) to migrate to SAP HANA and Azure during the same maintenance window.

正解: C

解説:
The SAP Database Migration Option (DMO) with System Move option of SUM, used as part of the migration allows customer the options to perform the migration in a single step, from source system on-premises, or to the target system residing in Microsoft Azure, minimizing overall downtime.
Reference:
https://blogs.sap.com/2017/10/05/your-sap-on-azure-part-2-dmo-with-system-move/ Migrate SAP Workloads to Azure Testlet 2 Case Study This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Overview
Contoso, Ltd. is a manufacturing company that has 15,000 employees.
The company uses SAP for sales and manufacturing.
Contoso has sales offices in New York and London and manufacturing facilities in Boston and Seattle.
Existing Environment
Active Directory
The network contains an on-premises Active Directory domain named ad.contoso.com. User email addresses use a domain name of contoso.com.
SAP Environment
The current SAP environment contains the following components:
* SAP Solution Manager
* SAP ERP Central Component (SAP ECC)
* SAP Supply Chain Management (SAP SCM)
* SAP application servers that run Windows Server 2008 R2
* SAP HANA database servers that run SUSE Linux Enterprise Server 12 (SLES 12) Problem Statements Contoso identifies the following issues in its current environment:
* The SAP HANA environment lacks adequate resources.
* The Windows servers are nearing the end of support.
* The datacenters are at maximum capacity.
Requirements
Planned Changes
Contoso identifies the following planned changes:
* Deploy Azure Virtual WAN.
* Migrate the application servers to Windows Server 2016.
* Deploy ExpressRoute connections to all of the offices and manufacturing facilities.
* Deploy SAP landscapes to Azure for development, quality assurance, and production.
All resources for the production landscape will be in a resource group named SAPProduction.
Business goals
Contoso identifies the following business goals:
* Minimize costs whenever possible.
* Migrate SAP to Azure without causing downtime.
* Ensure that all SAP deployments to Azure are supported by SAP.
* Ensure that all the production databases can withstand the failure of an Azure region.
* Ensure that all the production application servers can restore daily backups from the last 21 days.
Technical Requirements
Contoso identifies the following technical requirements:
* Inspect all web queries.
* Deploy an SAP HANA cluster to two datacenters.
* Minimize the bandwidth used for database synchronization.
* Use Active Directory accounts to administer Azure resources.
* Ensure that each production application server has four 1-TB data disks.
* Ensure that an application server can be restored from a backup created during the last five days within 15 minutes.
* Implement an approval process to ensure that an SAP administrator is notified before another administrator attempts to make changes to the Azure virtual machines that host SAP.
It is estimated that during the migration, the bandwidth required between Azure and the New York office will be
1 Gbps. After the migration, a traffic burst of up to 3 Gbps will occur.
Proposed Backup Policy
An Azure administrator proposes the backup policy shown in the following exhibit.

Azure Resource Manager Template
An Azure administrator provides you with the Azure Resource Manager template that will be used to provision the production application servers.


Migrate SAP Workloads to Azure
Question Set 3

 

質問 68
......


Microsoft AZ-120 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Scripting With Automation Tools, Including Script Development, Script Modification, And Deployment Dependencies
トピック 2
  • SAP Workload Performance SLA And Metrics
  • Certified And Support SAP Hana Hardware Directory
トピック 3
  • Implement And Manage Virtual Networking
  • Manage Access And Authentication On Azure
トピック 4
  • Implementation For SAP Workloads
  • HA Models Supported In HANA (N+N, N+0 And N+1)
トピック 5
  • Azure Enhanced Monitoring Extension For SAP
  • Disaster Recovery (DR) With Hero Regions
トピック 6
  • Design Criteria For Tailored Datacenter Integration (TDI) V4 And V5 Solutions
  • Migrate SAP Workloads To Azure
トピック 7
  • Databox With Import And Export
  • HANA System Replication (HSR)
トピック 8
  • Backup And Restore Methods And Solutions
  • Resiliency And Availability Inventory
トピック 9
  • Migration Considerations Design A Migration Strategy
  • Network Topology Requirements
トピック 10
  • Linux Vms Active Directory Domain Membership Mechanismmonitor SAP Workloads On Azure
トピック 11
  • Perform Infrastructure Validation Check
  • Role-Based Access Control (RBAC)
トピック 12
  • Database Habuild And Deploy Azure SAP Workloads
  • Create An Inventory Of Existing SAP Landscapes
トピック 13
  • Azure Monitorvalidate Azure Infrastructure For SAP Workloads
  • Azure Resource Manager (ARM) Template
トピック 14
  • Design A Core Infrastructure Solution In Azure To Support SAP Workloads
トピック 15
  • Dependenciesdesign A Resilient Azure Solution To Support SAP Workloads May Include
トピック 16
  • Operations System Inventory, Computing Inventory, Security Inventory
  • SAP Landscape Architecture
トピック 17
  • Infrastructure Optimization For Migrationdesign An Azure Solution To Support SAP Workloads
トピック 18
  • Backup And Restoration Requirements
  • Automate Deployment Of Virtual Machines (Vms)

 

最新のAZ-120試験エンジンPDFで全部無料問題集保証:https://www.goshiken.com/Microsoft/AZ-120-mondaishu.html

最新Microsoft Azure AZ-120実際の無料試験解答:https://drive.google.com/open?id=1X7JnCSpagLxpnrxFnvH-NLTtnr2nvE7R