
[2023年更新]合格できるSAP C-TS413-2020試験最新90問題
ゲット2023年最新の無料SAP C-TS413-2020試験問題 アンサー
SAP C-TS413-2020 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
SAP C_TS413_2020 認定試験に備えるために、候補者は SAP が提供するトレーニングコースを受講するか、SAP の公式認定ガイドを使用して独学することができます。試験は 80 問の多肢選択問題から成り、制限時間は 180 分です。試験の合格スコアは 64% であり、試験に失敗した候補者は 14 日の待機期間後に再受験することができます。
質問 # 43
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?
- A. Service entry sheet
- B. Invoice
- C. Purchase order
- D. Goods movement
正解:D
質問 # 44
Which of the following are checking instructions used to control availability checks?
- A. Checking groups
- B. Checking rules
- C. Checking types
- D. Checking profiles
正解:A、B
質問 # 45
You need to create a new functional location. Which actions can you perform with the SAP Fiori app
"Create Technical Object"? Note: There are 3 correct Answers to this question.
- A. Change a reference location.
- B. Edit classification data and characteristics.
- C. Assign a subordinate piece of equipment.
- D. Assign documents.
- E. Create a task list for functional location.
正解:A、B、D
質問 # 46
Which of the following provides general information on the SAP system and transaction or task on which you are working?
- A. Menu path
- B. Application toolbar
- C. Status bar
- D. Role bar
正解:C
質問 # 47
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?
- A. Package hierarchy
- B. Call horizon
- C. Initial/subsequent buffer
- D. Package offset
正解:C
質問 # 48
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note:
There are 2 correct Answers to this question.
- A. Release Print
- B. Complete Close Report
- C. Put in Process Schedule
- D. Release Start Work
正解:B、D
質問 # 49
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (annual performance / 365)
- B. Cycle length divided by ((scheduling period) x (cycle modification factor))
- C. Cycle length divided by annual performance
- D. Cycle length divided by monthly performance
正解:A
質問 # 50
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct Answers to this question.
- A. Manufacturer data
- B. Configuration
- C. Warranty
- D. Serial data
正解:B、D
質問 # 51
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question.
- A. Set the offset to 3 months.
- B. Set the call horizon to 90 days.
- C. Set the call horizon to 25%.
- D. Set the call horizon to 75%.
正解:A、C
質問 # 52
What is the goal of embedded analytics in SAP S/4HANA?
- A. Combine the HANA database with SAP BW InfoProviders.
- B. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.
- C. Combine transactional and analytical processing.
- D. Integrate SAP BW into SAP S/4HANA.
正解:C
質問 # 53
Which of the following statements about work centers are correct?
- A. They are only used in maintenance.
- B. They are organizational units that define when and where an operation must beperformed.
- C. They form the basis for cost calculation, capacity planning, and scheduling.
- D. They can be machine, production lines, or people.
正解:B、C、D
質問 # 54
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct Answers to this question.
- A. An activity in the notification header
- B. A text in the subject long text screen
- C. An entry in the object list
- D. A task in the notification item
正解:A
質問 # 55
Where can the maintenance planner perform a material availability check? Note: There are 2 correct Answers to this question.
- A. Via the SAP Fiori app "Manage Maintenance Order List"
- B. Via the multi-level order list (SAP GUI)
- C. Within the SAP Fiori-based background job
- D. Via the SAP Fiori app "Maintenance Scheduling Board"
正解:B、C
質問 # 56
What are the three pillars of SAP Activate?
- A. Methodology
- B. SAP Best Practices
- C. Performance tuning
- D. Guided configuration
正解:A、B、C
質問 # 57
Which of the following processes (applications) are part of the production processes?
- A. Material requirementsplanning
- B. Sales and Operations Planning
- C. Master production scheduling
- D. Manufacturing execution
- E. Delivery processing
正解:A、B、C、D
質問 # 58
What can you assign in a notification item? Note: There are 2 correct Answers to this question.
- A. Only one object part
- B. One or more object parts
- C. One or more causes of damage
- D. Only one cause of damage
正解:B、C
質問 # 59
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question.
- A. Via business partner and hourly price
- B. Via organizational unit and personal hourly rate
- C. Via activity type and hourly rate
- D. Via cost center and activity type
正解:C、D
質問 # 60
To which of the following organizational units can you directly assing a maintenanceplant? chose 1 answer
- A. standard purchasing organization
- B. personnel area
- C. profit center
- D. controlling area
正解:A
質問 # 61
Once the Job Card is printed, the status of the order changes to __________.
- A. JIPR
- B. Conf
- C. TECO
- D. TTJL
正解:D
質問 # 62
......
高合格率C-TS413-2020テスト問題集解答と正解90問題と回答:https://www.goshiken.com/SAP/C-TS413-2020-mondaishu.html