
[2023年04月21日] 有効なHQT-4180テスト解答HQT-4180試験PDF問題を試そう
有効なHitachi Vantara Qualified Professional HQT-4180問題集はあなたの合格を必ず保証します
質問 13
You need to replace a broken fan in a VSP E1090.
What is the correct procedure?
- A. Use the MPC for blocking the fan, then replace it.
- B. Use the Maintenance Utility for stopping the fan, then replace it.
- C. Use Storage Navigator for blocking the fan, then replace it.
- D. Remove the broken fan, then replace it.
正解: D
質問 14
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)
- A. You must use the Replace button in the Maintenance Utility before removing the drive.
- B. The Drive Box where the drive is located must be powered down.
- C. The red LED on the drive must be lit.
- D. You must wear a wrist strap for ESD protection.
正解: A,D
質問 15
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)
- A. Storage Navigator
- B. Initial Setup Wizard
- C. Maintenance Utility
- D. HSA Embedded
正解: B,C
質問 16
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)
- A. In Shared Memory, the Extension1 has to be enabled.
- B. Slots B of both controllers must be available for DKB installation.
- C. Drive Boxes (DBs) with SAS interface have to be added.
- D. Two additional Disk Boards (DKBs) have to be installed.
- E. The SAS Expansion license has to be installed.
正解: C,D,E
質問 17
What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)
- A. from DKA to DKB
- B. from ENC to ENC
- C. from DKB to ENC
- D. from DKA to SSW
正解: A,C
質問 18
The SVP of a VSP G900 system failed and you have been asked to replace it.
Which two items must be available to perform the replacement? (Choose two.)
- A. the microcode iso file with the correct software versions
- B. the iso file with the correct version of the Windows operating system
- C. the iso file with the correct version of Hitachi Ops Center
- D. the Hitachi Remote Ops Monitor Agent iso file
正解: A,C
質問 19
How many batteries does a VSP E1090 have per controller (CTL)?
- A. 0
- B. 1
- C. 2
- D. 3
正解: B
質問 20
What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?
- A. RAID 5
- B. RAID 1
- C. RAID 6
- D. RAID 1+0
正解: D
質問 21
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?
- A. Hitachi Ops Center Protector
- B. Hitachi Remote Ops Monitor Agent
- C. Storage Navigator
- D. Hitachi Remote Ops SVP Agent
正解: A
質問 22
What are two consequences when a "New Installation" procedure is performed on a VSP Midrange system? (Choose two.)
- A. The MPC software is updated.
- B. The license keys are deleted.
- C. The SVP drive is formatted.
- D. All the data on RAID groups is lost.
正解: C,D
質問 23
Which program is used to perform the "New Installation" procedure on a VSP midrange system?
- A. MPC
- B. BECK
- C. GUM
- D. Webconsole
正解: C
質問 24
Which program is used to perform the "New Installation" procedure on a VSP F700 system?
- A. SVP Web console
- B. Hitachi Ops Center Administrator
- C. MPC connected to the maintenance LAN port
- D. raidcom CLI
正解: B
質問 25
You are installing a VSP F370 and you need to connect your laptop to one of the controllers.
What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choose two.)
- A. 192.168.0.17
- B. 192.168.0.16
- C. 10.0.0.17
- D. 10.0.0.16
正解: B,D
質問 26
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)
- A. Manage multiple VSP Midrange storage systems.
- B. Perform Self-Service Maintenance.
- C. Manage virtual storage machines.
- D. Configure the Hitachi Remote Ops Monitor Agent.
正解: B,D
質問 27
......
HQT-4180問題集でリアル試験問題でテストエンジン問題集でトレーニング:https://www.goshiken.com/Hitachi/HQT-4180-mondaishu.html
HQT-4180テスト問題集とオンライン試験エンジン:https://drive.google.com/open?id=1U45fJuDwPqxAC78sOE_CJknG5vlPKfij