
[2025年12月15日] 更新されたE_S4CON_2505試験PDF問題集にはGoShiken合格保証付き
あなたを合格させるSAP試験にはE_S4CON_2505試験問題集
SAP E_S4CON_2505 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
質問 # 23
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in status "automatic adjustment" (green traffic light).
What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
- B. SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
- C. SUM continues with the next phase and your modifications are kept as in the start release.
- D. Before continuing with the next phase, SUM asks for a modification adjustment transport.
正解:D
質問 # 24
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.
- A. In Process Control Center
- B. In SUM Parameters
- C. In DMO Migration Preparation
- D. In SUM Analysis
正解:A、B
質問 # 25
What is the benefit of using the UPGANAXML file from a previous SUM run?
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To make the progress information within SUM UI more accurate
- C. To repeat specific phases during the SUM run
- D. To skip selected phases during the SUM run
正解:B
質問 # 26
You performed a custom code check for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.
- A. SAT(Runtime Analysis)
- B. SE80 (Object Navigator)
- C. SYCM (Simplification Database Content)
- D. ATC (ABAP Test Cockpit)
正解:B、D
質問 # 27
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Database migration
- B. Unicode conversion
- C. Software update
- D. Custom code analysis
正解:A、C
質問 # 28
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. You need to build up an SI check framework by applying SAP Notes.
- B. You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
- C. The Si checks are executed in the development system and the results are transported into the subsequent systems.
- D. The errors from the SI checks must be solved; otherwise, SUM will report an error.
正解:A、D
質問 # 29
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
- A. Shadow on target creation
- B. Silent data migration (SDM)
- C. Downtime conversion
- D. Downtime migration
正解:D
質問 # 30
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
- A. Run the database migration to the SAP HANA database.
- B. Check the compatibility of custom code with SAP S/4HANA.
- C. Perform the migration of data to the new data structure.
- D. Solve problems from the simplification item (SI) checks.
正解:B
質問 # 31
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE MIG SOT RUN
- B. EU_CLONE MIG_DT_CREATTE
- C. EU CLONE MIG_DT_RUN
- D. EU IMPORT ALL
正解:C
質問 # 32
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A.
- B.
- C.
- D.
- E.
正解:C、D、E
質問 # 33
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Install add-on SAP Gateway 7.50.
- B. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
- C. Perform the custom code adjustment.
- D. Delete client 066 (Early-Watch client).
正解:B、D
質問 # 34
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?
- A. The start of the Execution roadmap step
- B. The end of the business downtime
- C. The start of the business downtime
- D. The end of the database migration
正解:B
質問 # 35
You are performing an SAP S/4HANA conversion of the development system.
Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of a named user in client 000 of the shadow system
- C. Credentials of a named user in the development client of the development system
- D. Credentials of user DDIC in client 000 of the shadow system
正解:C
質問 # 36
You want to use the Custom Code Migration Work list via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?
- A. Apply the corresponding SAAP Note via the Note Assistant.
- B. Generate it by analyzing the specific custom code via RFC.
- C. Configure it within transaction ATC.
- D. Download it from the SAP Support Portal.
正解:D
質問 # 37
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It explains where to find information about the custom code analysis.
- B. It is a operating system-specific document.
- C. It contains a section about the simplification item (SI) checks.
- D. It explains the database migration option (DMO) of SUM.
正解:A、C
質問 # 38
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?
- A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
- B. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
- C. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
- D. The SAP Support Packages that will be bound to the conversion
正解:A
質問 # 39
......
最新でリアルなE_S4CON_2505試験問題集解答:https://www.goshiken.com/SAP/E_S4CON_2505-mondaishu.html
E_S4CON_2505試験問題集でSAP練習テスト問題:https://drive.google.com/open?id=1Jsujj88qopyoBBF3htq7etW-aK2zT7mi