質問 # 22
The chief executive officer reminds a program manager that a program must deliver a 30% reduction in customer complaints by the end of the year. Where is this expectation documented1?
- A. Customer management plan
- B. Benefits sustainment plan
- C. Benefits management plan
- D. Program quality standards
正解:C
質問 # 23
A three-year program using vendor contracts, incorporating related projects, and each with specific stakeholders is coming to an end.
What should be completed first to close all appropriate contracts?
- A. Assess all contracts to ensure all agreed conditions are mot
- B. Conduct a procurement audit to review the procurement process
- C. Certify contract completion
- D. Review contract management plan for completeness
正解:A
質問 # 24
In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics.
Which two of the following are REQUIRED for the UL standard? (Select two options.)
- A. Visual inspection
- B. Texture test
- C. Adhesion test
- D. Durability test
- E. Thickness test
正解:A、C
質問 # 25
What actions are taken in the process of developing and maintaining a program risk register?
- A. Assign ownership of risks with appropriate responsibilities, document agreed-upon response strategies, and identify residual risks.
- B. Assign ownership of risks with appropriate responsibilities, document agreed-upon response strategies, and proactively manage program issues
- C. Assign ownership of risks with appropriate responsibilities, document agreed-upon response strategies and provide the foundation for the risk management plan
- D. Assign ownership of risks with appropriate responsibilities, document agreed-upon response strategies and identify the root cause of potential risks
正解:C
質問 # 26
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?
- A. Neutralizing transformers
- B. 2-winding neutralizing transformers
- C. Unit-type neutralizing transformers
- D. Mutual drainage reactors
- E. Isolating transformers
正解:A
質問 # 27
During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the
- A. stakeholders
- B. legal counsel
- C. technical consultant
- D. construction foreman
正解:A
質問 # 28
Which two of the following are included in the ICT distribution designer's role of vendor and contractor coordination'? (Select two options.)
- A. Conduct final ICT inspections to ensure standard and code compliance, design intent, and/or client requirements are met.
- B. Assist in the resolution of unforeseen conditions, change orders. RFIs, and changes to the project's critical path
- C. Produce ICT closeout documentation for the owner to provide the record documentation of the installation
- D. Monitor project schedule for delays
- E. Communicate status to stakeholders
正解:B、C
質問 # 29
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
- A. Category 6
- B. Category 6A
- C. Category 5
- D. Category 5e
- E. Category 3
正解:E
質問 # 30
Which of the following is TRUE about convenience receptacles?
- A. They must be powered by emergency power to prevent loss of service.
- B. They are duplex or quad receptacles mounted on perimeter walls.
- C. They shall be connected to occupancy sensors to ensure user safety.
- D. They increase the count of outlets needed on the equipment racks.
- E. They are those into which equipment, such as switches, shall be plugged
正解:B
質問 # 31
A global enterprise resource planning (ERP) program's scope includes designing and building a global template. Plans include a pilot implementation project to validate the template, to be followed by several rollout projects. During the build of the global template, a new government regulation mandates implementation of a goods and services tax (GST).
What should the program manager update?
- A. Benefits transition plan
- B. Program communications management plan
- C. Benefits management plan
- D. Stakeholder engagement plan
正解:B
質問 # 32
Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the siding of the exterior. For these reasons, telecommunications cabling shall be acceptance tested. Acceptance testing includes visual examination and verification of all cabling and qualification of copper cabling for data cabling or certification of copper or optical fiber cabling for data cabling.
Verification testing is generally performed in which two of the following steps? (Choose two.)
- A. Prior to the installation of the cable tray system for spurs, points that would or could damage the cable infrastructure
- B. Post the acceptance of the construction contract once the Project Manager has approved this phase
- C. Post the implementation of the construction
- D. Prior to the installation of insulation and drywall
- E. During the trim-out stage of the cabling after painting
正解:D、E
質問 # 33
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
- A. Category 7/class F
- B. Category 5e/class D
- C. Category SA/class EA
- D. Category 6/class E
正解:D
質問 # 34
A hotel chain initiates a program to expand meeting offerings to include telecommunications technology and virtual meetings. The program has component projects, each of which requires team members to have different technical skills and expertise. The program manager assembles a team of project managers to lead each of the projects, and learns that the desired resources will not be available at the start of the program
As a result, the program manager must do which of the following'?
- A. Assign the tasks on the critical path to the resources available to adhere to the project schedule
- B. Delay the start of the program until the assigned resources are available
- C. Utilize team members that are currently available, even though they do not have the expertise needed.
- D. Apply resource leveling considering the constraints of time, budget, and quality
正解:D
質問 # 35
The type of apparatus housed in ERs vary greatly in size, purpose and function.
Which two of the following active equipment is included? (Choose two.)
- A. Building system equipment
- B. Cross-connect facilities
- C. Environmental controls
- D. Lighting controls
- E. Telecommunications equipment
正解:A、E
質問 # 36
In an office area, a consultant needs to add the location of a fax machine to the plan.
What is the approximated floor area that a fax machine occupies?
- A. 1 sq m (10 sq ft)
- B. 0.5 sq m (5 sq ft)
- C. 0.2 sq m (2 sq ft)
- D. 1.5 sq m (16 sq ft)
- E. 2 sq m (20 sq ft)
正解:C
質問 # 37
Using a vertical cable support structure can create issues for the cable attached to the pathway Several issues can result It the support work is not clone correctly.
Which two of the following conditions could be caused by a poorly supported cabled (Select two options?
- A. Lower dB loss values
- B. Slippage between the cable core and the sheath
- C. Stretching of copper conductors and breakage of optical fiber strands
- D. Reduced expected useful life and performance
- E. Increased Interference levels
正解:C、D
質問 # 38
An ICT distribution designer is reviewing design documents with the owner to gam approval for an ER design.
Which of the following information about the site shall be included?
- A. Sustainability requirements
- B. Designer requirements
- C. Access and/or service provider requirements
- D. Suitability requirements
正解:C
質問 # 39
......