質問 # 51
The _____ technique for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks.
- A. top-down
- B. bottom-up
- C. mind mapping
- D. analogy
正解:C
質問 # 52
In aGantt chart, a project is broken down into what?
- A. activities and who is responsible for each
- B. project risks and mitigations
- C. time periods and what activity is completed when
- D. budgets and budget owners
正解:C
解説:
AGantt chartvisually maps activities againsttimeto show sequencing and overlap of tasks. It's used for scheduling, tracking progress, and identifying dependencies.
Reference:CIPS L5M8 Study Guide, p.227.
質問 # 53
Project stakeholder management has resonances with project cost management and project time management.
- A. True
- B. False
正解:B
質問 # 54
Subcontractors are primary members of the supply chain and have an impact on value-adding activities of a project. Is this sentence TRUE?
- A. yes - subcontractors are always used on large, complex projects
- B. no - subcontractors do not have an impact on value-adding activities
- C. yes - subcontractors can fulfil a need for a complex skill
- D. no - subcontractors are not primary members of the supply chain
正解:D
解説:
Subcontractorstypically sit attier 2/3, so they arenot primary (tier-1) members. However, theydoinfluence value creation and project success, so D is incorrect.
Reference:CIPS L5M8 Study Guide, p.30.
質問 # 55
Which of the following would you expect to see in aProject Reportdrafted by a Project Manager?Select TWO
- A. an indication of the overall health of the project using a RAG system
- B. a stakeholder management plan
- C. a list of issues currently facing the project
- D. 5-10 pages of detailed progress information
正解:A、C
解説:
AProject Reportis concise (1-2 pages), highlightingcurrent project status (RAG rating)andkey issues
/risks. Thestakeholder management planbelongs in the Project Initiation Document, not in progress reports.
Reference:CIPS L5M8 Study Guide, p.177.
質問 # 56
At which stage of the project lifecycle is akick-off meetingusually held and the project is assigned abudget?
- A. design stage
- B. strategic stage
- C. planning stage
- D. initiation stage
正解:D
解説:
Theinitiation stagefollows the strategic stage in the project lifecycle. Here, project approval is granted, the kick-off meetingoccurs, and abudgetis formally assigned. This ensures stakeholder alignment before detailed planning begins.
Reference:CIPS L5M8 Study Guide, p.18.
質問 # 57
What is the purpose of theproject controlstage within the project lifecycle?
- A. to ensure resources required to complete project tasks are available in a timely manner
- B. to monitor the project outcomes in terms of KPIs
- C. to set limits and boundaries to what can be achieved
- D. to ensure there are no deviations from the project timeline
正解:A
解説:
Thecontrol stageensures that resources, people, and materials areavailable when needed, that progress is monitored, and that corrective actions are taken when deviations occur. It focuses on resource flow and issue resolution - not strict adherence to plan, since projects often evolve.
Reference:CIPS L5M8 Study Guide, p.74.
質問 # 58
In which of the following contracts does the buyer pay the supplier for allowable performance costs along with a predeined percentage based on total costs?
- A. CPPC
- B. CPIF
- C. FPIF
- D. CPAF
正解:A
質問 # 59
_____ should result in improvements in project performance.
- A. defect repairs
- B. preventive actions
- C. product acceptance plans
- D. corrective actions
正解:A
質問 # 60
_____ are unplanned responses to risk events used when project teams do not have contingency plans in place.
- A. Fallback plans
- B. Triggers
- C. Workarounds
- D. Contingency plans
正解:C
質問 # 61
_____ refers to the process of developing a working replica of the system or some aspect of the system.
- A. prototyping
- B. variance
- C. use case modeling
- D. decomposition
正解:A
質問 # 62
A(n) _____ is a task at the lowest level of the WBS.
- A. variance
- B. work package
- C. objective
- D. deliverable
正解:B
質問 # 63
During theconvergence phaseof a market lifecycle, which of the following are true?Select TWO
- A. there are many acquisitions and mergers
- B. organisations look to deliver products at a reduced cost
- C. there is an increase in customer demands
- D. there is an increase in variety of products offered
正解:A、B
解説:
In theconvergencephase, products/services becomestandardised, competition intensifies, and firms seekcost efficiency.Mergers and acquisitionsincrease as companies consolidate to sustain market position.
Reference:CIPS L5M8 Study Guide, pp.120-121.
質問 # 64
What information does aCritical Path scheduleprovide to the project team?Select TWO
- A. a realistic duration of the project
- B. why the project is delayed
- C. where the project is up to in terms of delivery
- D. the longest and shortest possible durations of the project
正解:A、D
解説:
TheCritical Path Method (CPM)identifies the sequence of tasks that determine total project duration. It provides arealistic time estimateand indicates bothshortest and longestcompletion possibilities, guiding scheduling decisions.
Reference:CIPS L5M8 Study Guide, p.224.
質問 # 65
In the project lifecycle, which of the following stages is completed last?
- A. closure
- B. co-ordination
- C. review
- D. control
正解:C
解説:
The final step in the lifecycle is thereview stage, following closure. It evaluates project success against objectives and captures lessons learned for future improvement.
Reference:CIPS L5M8 Study Guide, p.66.
質問 # 66
Scope refers to all the work involved in creating the products of the project and the processes used to create them.
- A. True
- B. False
正解:A