
[2026年09月最新リリース]C_P2W22_2504試験問題はあなたをパスさせる
SAP C_P2W22_2504試験基本問題とアンサー
質問 # 49
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Advanced Planning
- B. Standard Sales and Operations Planning
- C. Integrated Business Planning
- D. Flexible Planning
正解:C
質問 # 50
Which order type is used for repetitive manufacturing?
- A. Process order
- B. Planned order
- C. Kanban order
- D. Production order
正解:B
質問 # 51
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
正解:C、D
質問 # 52
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.
- A. Replenishment using reservations
- B. Replenishment using process orders
- C. Replenishment using direct transfer posting
- D. Replenishment using planned independent requirements
正解:A、C
質問 # 53
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. The delivery time is reduced.
- B. You have the option to use make-to-order production.
- C. Manufacturing time for final assembly is reduced.
- D. You have the option to use forecast planning.
正解:B、D
質問 # 54
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Which plant-specific and plant-independent statuses are allowed
- B. Which number range interval the material number comes from
- C. Which document types and class categories are allowed
- D. Whether value changes to financial accounting stock accounts are updated
正解:B、D
質問 # 55
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use a different MRP planner for PP/DS materials
- C. Use a propagation range
- D. Use the special MRP type XO
正解:B、D
質問 # 56
When working with the material status, for which business areas can you set a warning message?
Note: There are 2 correct answers to this question.
- A. Plant Maintenance
- B. Sales
- C. Classification
- D. Purchasing
正解:A、B
質問 # 57
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- B. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- C. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
正解:D
質問 # 58
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Setup time
- B. Total replenishment lead time
- C. Opening period
- D. Float after production
正解:A、D
質問 # 59
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Scheduling control > Close gap
- B. Planning mode > Bucket
- C. Scheduling control > Find slot
- D. Planning mode > Order priority
正解:B、C
質問 # 60
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot size range of the assigned routing.
- B. The assigned routing and bill of material (BOM) must have the same validity period.
- C. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- D. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- E. The consistency check must be performed.
正解:A、D、E
質問 # 61
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
- B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
- D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
正解:C
質問 # 62
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material master
- D. Select a special explosion type inside the material BOM (bill of material)
正解:A、C
質問 # 63
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A. Lot size or material cost
- B. Validity period or sales order
- C. Alphanumeric or quota arrangement
- D. Planned order or material number
正解:C
質問 # 64
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (unfirmed)
- B. ATP quantities
- C. Planned orders (firmed)
- D. Production orders
正解:C、D
質問 # 65
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Determine a time period with available capacity on the planning board
- B. Reduce the planning time interval
- C. Form optimum sequences to reduce setup times
- D. Execute an infinite production planning run for the critical resources
- E. Increase the capacity supply in a time-phased interval
正解:A、C、E
質問 # 66
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. All operations
- B. Sub-operations
- C. Only bottleneck operations
- D. Operations assigned to a pacemaker work center
正解:B、C
質問 # 67
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the production storage location
- B. To control the flow of material from the central storage location to the production storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the central storage location
正解:B
質問 # 68
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Insights
- B. SAP Signavio Process Intelligence
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Governance
正解:C
質問 # 69
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative offset time
- B. Specify a negative planning horizon
- C. Specify a negative opening period
- D. Specify a negative PP/DS horizon
正解:A
質問 # 70
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Assembly processing with production orders (82)
- B. Planning with final assembly (40)
- C. Planning at assembly level (70)
- D. Production by lot size (30)
正解:C
質問 # 71
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. An operation is scheduled as close as possible to the desired date.
- B. To create a slot, neighbouring operations are moved in both planning directions.
- C. Sequencing on multi-activity resources is automatically updated during planning.
- D. Operations on multi-resources are planned finitely in a sequence.
正解:A
質問 # 72
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.
- A. By capacity planning
- B. By order confirmation
- C. By order release
- D. By mass processing
正解:C、D
質問 # 73
......
2026年最新のリアルな無料SAP C_P2W22_2504試験問題集問題と解答:https://www.goshiken.com/SAP/C_P2W22_2504-mondaishu.html
C_P2W22_2504練習テストエンジン購入前に試そう82試験問題:https://drive.google.com/open?id=1I3rs7Q3WJtii1jtc_CDwMcHa5OXd0ACR