
C-TS414-2023 PDF問題集で2024年10月16日試験問題 有効なC-TS414-2023問題集
究極のC-TS414-2023準備ガイドで無料最新のSAP練習テスト問題集
SAP C-TS414-2023 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 # 48
Your customer plan to use Test Equipment Management as part of QM.
What event triggers the creation of an inspection lot for calibration inspection?
- A. Creation of maintenance order
- B. Release of a maintenance order
- C. Scheduling a maintenance plan
- D. Assignment of Equipment to a maintenance plan
正解:B
質問 # 49
when you plan an audit for which component can you define partners?(2 correct Ans)
- A. Audit
- B. CAPA
- C. Audit Question
- D. Question
正解:A、B
質問 # 50
In the material master, at which organizational level do you create Quality management (QM) data for inspection type.
- A. Company code level
- B. Business area level
- C. Plant level
- D. Client level
正解:C
質問 # 51
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing.........
- A. Usage of the class characteristics in the task list
- B. Master inspection characteristic linked to class characteristics
- C. Configuration settings
- D. Settings for the inspection type activated in the material level
正解:B
質問 # 52
You are using quantitative inspection characteristics during a production results recording.What are some of the results confirmation control indicators available for quantitative results?Note: There are 3 correct answers to this question.
- A. Single result
- B. Classed recording
- C. Mean value and standard deviation
- D. Mean value
- E. Summarized recording
正解:A、D、E
質問 # 53
The quality inspector records defects in results recording for a material inspection. When creating notification the system determines the catalog profile by consulting objects in which of following sequences?
- A. report type - Notification Type - Material
- B. report type - Material - Notification Type
- C. Material - Notification Type - report type
- D. Notification Type - report type - Material
正解:C
質問 # 54
When creating a process order, what type of task list is primary used for inspection ? Correct 3
- A. Reference rate routing
- B. Routings
- C. Equipment
- D. master recipe
正解:A、B、D
質問 # 55
You have assigned a dynamic modification level to an inspection plan, which dynamic modification criterion is pre-defined and not editable?
- A. Customer
- B. Vendor
- C. Manufacturer
- D. Material
正解:A
質問 # 56
The quality inspector check the receipt of incoming certificates in the future, they want to manage the inbox for quality certificates independently for goods receipts.
What do you activate to fulfill this requirement?
- A. Enhanced certificate processing in the certificate type.
- B. Certificate profiles in certificate type
- C. Certificate Control in the Q- info record in procurement
- D. Status profiles in the certificate type
正解:A
質問 # 57
You can user business application programing interface (BAPIs) for different tests Which of the following statements describes a BAPI?
- A. A customer exit
- B. Complex function module
- C. A reporting transaction
- D. An enhancement point
正解:B
質問 # 58
Your customer wants to periodically calibrate the quality management test equipment used in an inspection plan .
Which type of test equipment must used ?
- A. Documents
- B. Materials
- C. Equipment
- D. Production resource/ tools PRTs
正解:C
質問 # 59
An inspection plan group includes multiple inspection plans with different group counters. What determines the selected inspection plan when you create an inspection lot?
- A. Lot size
- B. Sample size
- C. Material type
- D. Procurement type of the material
正解:A
質問 # 60
Which partner role is available in a standard vendor notification
- A. shipping point
- B. work center
- C. sold to party
- D. coordinator
正解:D
質問 # 61
You must assign a certificate profile for outgoing certificates to a key combination. What key combination can be used without additional settings?
- A. Customer, Material, Material Group
- B. Material, Customer, Material Group
- C. Material/Customer, Material, Material Type
- D. Material/Customer, Material, Material Group
正解:C
質問 # 62
Which inspection origin creates only unplanned physical samples?
- A. 3 production
- B. 2 goods issue
- C. 15 sample management
- D. 16 stability study
正解:C
質問 # 63
Which process step can automatically create a quality notification?
- A. Creation of quality info record
- B. Creation of an inspection Lot
- C. Characteristics result recording
- D. Making a UD
正解:C
質問 # 64
You must assign a certification profile for outgoing certificates to key combination. What key combination that require no adjustment does SAP QM prove
- A. Customer, Material, Material group
- B. Material , Customer, Material group
- C. Material /Customer, Material Material type
- D. Material /Customer, Material Material group
正解:B
質問 # 65
To use an inspection plan without multiple specification , you must assign a material master and plant. What additional data can you assign to an inspection plan?(2 correct Ans)
- A. Customer
- B. Vendor
- C. Search field
- D. Inspection type
- E. Notification type
正解:A、B
質問 # 66
Which Status allows you to make a usage decision without using the force inspection competition function for all mandatory characteristic results.
- A. 0
- B. 1
- C. 2
- D. 3
正解:B
質問 # 67
When an inspection plan includes multiple group counter, what determines the unit of measure ?
- A. lot size
- B. Sampling procedure
- C. Usage
- D. Material master
正解:C
質問 # 68
For what type of cost collector does an inspection lot capture appraisal and non conformity costing?
- A. A quality management order
- B. A controlling general ledger
- C. A quality Notification
- D. A company code general ledger
正解:A
質問 # 69
Your customer requires the lab to use quantitate characteristics during a production result recording.
Which result confirmation control indicators are available for quantitative results
- A. Single value
- B. Class confirmation
- C. Summarized
- D. Tolerance keys
- E. Mean value
正解:A、B、C
質問 # 70
By integrating the QM component in the production process, you can monitor and document process capability and the quality of products.
Which statistical and graphical tools does SAP provide to monitor a process ?
- A. Statistical process controls (SPC)
- B. Quality management inspection data interface QM-ID
- C. Quality management information system
- D. Statistical report charts
正解:A
質問 # 71
Which of the following QM business processes can require a user's digital signature?(3 Correct Ans)
- A. Manual confirmation of a physical sample drawing
- B. Approval of quality notification
- C. Defective recording in the inspection Lot
- D. Result recording in the inspection Lot
- E. UD for an inspection lot
正解:A、D、E
質問 # 72
......
合格率 取得する秘訣はC-TS414-2023認定試験エンジンPDF:https://www.goshiken.com/SAP/C-TS414-2023-mondaishu.html
今すぐ試そう!高評価SAP C-TS414-2023試験問題集:https://drive.google.com/open?id=1UGSW1g1NI04UGaiW92ic9d4tk_vNUHzY